TOSHIBA
24
4.3 Power Connections 50 kVA
The following illustrates the wiring connections from the power distribution panel (not part of
the UPS) to the terminal block of the 50 kVA UPS Model
Optional: Bypass Input:
3-phase, 3-wire
208V requires 3-phase,
4-wire
(H1) (H2) (H3) (N)
(H1) (H2) (H3) (N) (L1) (L2) (L3) (N) (+) (-)
OUTPUT: 3-phase (4-wire) INPUT: 3-phase, 3-wire
208V requires 3-phase, 4-wire