Toshiba HV6AS instruction manual Check Points for Inspection cont’d, Page, Maintenance

Models: HV6AS

1 39
Download 39 pages 4.92 Kb
Page 32
Image 32
Table 2. Check Points for Inspection (cont’d)

Page 28

MAINTENANCE

Table 2. Check Points for Inspection (cont’d)

Check Point

Check Item

Check Method

Criteria

What to do

 

 

 

 

 

Auxiliary

Terminals loose

Visual

Make sure terminals are

Repair if

Switch

or disconnected

inspection.

not loose or disconnected.

disconnected.

 

 

Tighten using a

 

Tighten if loose.

 

 

screwdriver.

 

See Table 1 for

 

 

 

 

tightening torques.

 

 

 

 

 

 

Case/contacts

Visual

Make sure there is no

Replace if damaged

 

 

inspection.

damage or warping.

or warped.

 

 

 

 

 

Control

Smooth

Energize the

Breaker (motor-operated

If the circuit fails to

Circuits

movement of

control circuit.

type) should charge

operate, check the

 

motor charging

 

quickly and smoothly.

cause and repair.

 

mechanism

 

 

 

 

 

 

 

 

 

Terminals loose

Visual

Make sure terminals are

Repair if

 

or disconnected

inspection.

not loose or disconnected.

disconnected.

 

 

Tighten using a

 

Tighten if loose.

 

 

screwdriver.

 

See Table 1 for

 

 

 

 

tightening torques.

 

 

 

 

 

Insulation

Meaure main

Megger test at

Resistance should be

If the insulation

Resistance

circuit to ground

1000V.

500Mor greater.

resistance is low,

Measure-

 

 

 

wipe off the vacuum

ment

 

 

 

interrupter and other

 

 

 

 

insulation surfaces

 

 

 

 

 

Meaure

Megger test at

Resistance should be

with a clean dry

 

between main

1000V.

100Mor greater.

cloth and then

 

circuit terminals

 

 

repeat the test.

 

 

 

 

 

 

Meaure control

Megger test at

Resistance should be

 

 

circuits to

500V.

2Mor greater.

 

 

ground

 

 

 

 

 

 

 

 

Page 32
Image 32
Toshiba HV6AS instruction manual Check Points for Inspection cont’d, Page, Maintenance