L2 Managed Switch
Feet
Bottom of the
Device
Notch
FFFFFFFFFFFFDesktop Installation
■■ Rack Installation
To install the device in an EIA
111 Check the grounding and stability of the rack.
222Secure the supplied
Rack- mounting Bracket
Screw
FFFFFFFFFFFFBracket Installation
333 After the brackets are attached to the device, use suitable screws (not provided\ to secure the brackets to the rack, as illustrated in the following figure.
Rack
FFFFFFFFFFFFRack Installation
Caution:
■■ Please set 5~10cm gaps around the device for air circulation. ■■ Please avoid any heavy thing placed on the device.
■■ Please mount devices in sequence from the bottom to top of the rack and ensure a certain clearance between devices for the purpose of heat dissipation.
Installation 09