L2 Managed Switch

FFFFFFFFFFFFConnecting to Power Supply

Note: The figure is to illustrate the application and principle. The power cord you get from the package and the socket in your situation will comply with the regulation in your country, so they may differ from the figure above.

4444Initialization

After the device is powered on, it begins the Power-On Self-Test. A series of tests run automatically to ensure the device functions properly. During this time, its LED indicators will respond as follows.

For TL-SG3210 Switch:

The Power LED indicator will light on all the time.

The LED indicators of all the ports will light on for several seconds and then turn off after the initialization.

The System LED indicator will flash, which represents a successful initialization.

For TL-SG3216/TL-SG3424/TL-SG3424P Switch:

The Power LED indicator will light on all the time.

After keeping off for several seconds, the LED indicators of all the ports will flash momentarily and then turn off again after the initialization.

The System LED indicator will flash, which represents a successful initialization.

Connection 17

Page 21
Image 21
TP-Link TL-SG3424 manual 4444Initialization, For TL-SG3210 Switch