Contents
Foreword | 2 |
|
|
Warranty | 2 |
|
|
Reception of unit | 2 |
|
|
Cautions and warnings | 2 |
|
|
Refrigerant | 2 |
General information
Unit Inspection | 5 |
|
|
Inspection Checklist | 5 |
|
|
Loose Parts Inventory | 6 |
|
|
Description of the Unit | 6 |
|
|
General Data RTUB | 7 |
|
|
General Data RTCA | 8 |
Installation
Installation Responsibilities | 9 |
|
|
Storage | 9 |
|
|
Special Lifting and Moving Instructions | 10 |
|
|
Isolation | 10 |
|
|
Foundation | 10 |
|
|
Clearances | 11 |
|
|
Drainage | 12 |
|
|
Releasing the Nitrogen Holding Charge | 12 |
|
|
Water Connections (RTUB) | 12 |
|
|
Flow Switch Installation | 13 |
|
|
Water Pressure Gauges | 13 |
|
|
Refrigeration Safety Valves | 14 |
|
|
Water Pressure Relief Valves | 14 |
|
|
Installing and ConnectingTemperature Sensors | 14 |
|
|
Connecting RTUB with the Remote | 15 |
3 |