Installation
Follow the manufacturer's instructions for the installation procedures.
Flow Switch Installation
1.Mount the switch upright, with a minimum of 5 pipe diameters of straight horizontal run on each side. Do not install close to elbows, orifices, or valves. Note: The arrow on the switch must point in the direction of flow.
2.To prevent switch fluttering, remove all air from the water system. Note:The
3.Adjust the switch to open when water flow falls below nominal. Evaporator data is given inTable 1.
4.Install a pipe strainer in the entering
Water Treatment
CAUTION
If calcium chloride is used for waste treatment, an applicable corrosion inhibitor must also be used. Failure to do so may result in damage to system components. Dirt, scale, products of corrosion, and other foreign material will adversely affect heat transfer between the water and system components. Foreign matter in the
use inTrane units. Use of either will lead to a shortened life to an indeterminable degree.TheTrane Company encourages the employment of a reputable water treatment specialist, familiar with local water conditions, to assist in this determination and in the establishment of a proper water- treatment program.
Water Pressure Gauges
Install
Figure 7 - Typical piping of the evaporator (RTUB)
1 Air vent
2 Balance valve
3 Flow switch 4Thermometers
5 Expansion joints
6 Stop valves
7Manometer
8Evaporator
9Filter
10Drainage
7
3 | 8 |
2
6
1 | 5 |
4
6
9
10