Trane SCWH, SCRH manual Proper Lifting Procedure, pre-installation Installation considerations

Models: SCWH SCRH

1 36
Download 36 pages 54.67 Kb
Page 10
Image 10
Improper Unit Lift!

pre-installation

Installation considerations

Proper Lifting Procedure WARNING

Improper Unit Lift!

Test lift unit approximately 24 inches high to verify the proper center-of- gravity lift point. To avoid dropping the unit, reposition the lifting point if the unit is not level. Failure to properly lift the unit could result in death, serious injury, or possible equipment/ property-only damage.

Proper Lifting Procedure

Follow these instructions and reference Figure I-PC-3.

1.Slide a fork lift into the opening provided on the unit base. Move the fork lift carefully.

2.Using slings, attach through the circular holes provided on the unit base. Protect the unit from damage by rigging equipment.

Figure I-PC-3. Proper unit lifting procedure

10

PKG-SVX14A-EN

Page 10
Image 10
Trane SCWH, SCRH manual Proper Lifting Procedure, pre-installation Installation considerations, Improper Unit Lift