Pre-Start

Checklist

Pre-Start-up Checklist

Before energizing the unit, the following system devices must be checked:

____ Is the high voltage power supply correct and in accordance with the nameplate ratings?

____ Is the field wiring and circuit protection the correct size?

____ Is the low voltage control circuit wiring correct per the unit wiring diagram?

____ Is the piping system clean/complete and correct? (A recommendation of all system flushing of debris from

the water-to-refrigerant heat exchanger, along with air purging from the water-to-refrigerant heat exchanger be done in accordance with the Closed-Loop/Ground Source Heat Pump Systems Installation Guide).

____ Is vibration isolation provided? (i.e. unit isolation pad, hosekits)

____ Is unit serviceable? (See clearance specifications on page 6).

____ Are the low/high-side pressure temperature caps secure and in place?

____ Are all the unit access panels secure and in place?

____ Is the thermostat in the OFF position?

____ Is the water flow established and circulating through all the units?

____ Is the duct work (if required) correctly sized, run, taped, insulated and weather proofed with proper unit

arrangement?

____ Is the condensate line properly sized, run, trapped and pitched?

____ Does the indoor blower turn freely without rubbing?

____ Has all work been done in accordance with applicable local and national codes?

____ Has heat transfer fluid been added in the proper mix to prevent freezing in closed system application?

WSHP-SVX04A-EN

25

Page 25
Image 25
Trane WPVJ, WPHF manual Pre-Start Checklist, Pre-Start-up Checklist