Start-up Checklist

and Log

Installing Contractor: Use this form to thoroughly check-out the system and units before and during start-up. (This form need not be returned to the factory unless requested during technical service support).

Job Name:

Model Number:

Date:

Serial Number:

In order to minimize troubleshooting and costly system failures, complete the following checks and data entries before the system is put into full operation.

MODE

Entering fluid temperature

Leaving fluid temperature

Temperature differential

Return-air temperature DB/WB

Supply-air temperature DB/WB

Temperature differential

Water coil heat exchanger (Water Pressure IN)

Water coil heat exchanger (Water Pressure OUT)

Pressure Differential

HEAT

F

F

F

F

F

F

PSIG

PSIG

PSIG

COOL

F

F

F

F

F

F

PSIG

PSIG

PSIG

COMPRESSOR

Amps

Volts

 

Discharge line temperature

F

(after 10 minutes)

 

F

30

WSHP-SVX04A-EN

Page 30
Image 30
Trane WPHF, WPVJ manual Start-up Checklist Log, Job Name Model Number Date Serial Number