GAS PIPING INSTALLATION
NOTE: The
2.Install a ground union joint downstream of the
3.Install a drip leg at least six (6) inches in depth next to the union as shown in Figure 14. This drip leg is required to collect any sediment that may be deposited in the line.
4.Before connecting the piping circuit to the unit, bleed the air from the supply line. Then cap or plug the line and test the pressure at the tapped
5.Using an appropriate backup wrench on the gas valve inlet boss, connect the gas piping to the unit. Check the completed piping for leaks using a soap and water solution or the equiva- lent.
6.After installation of the gas pipe in the unit, the pipe chase opening should be closed with the filler/barrier plug provided.
MANIFOLD PRESSURE
Check the manifold pressure at the unit gas valve. Do not exceed the recommended pressure shown on the unit nameplate.
t BURNER & VALVE ILLUSTRATION | ||
|
| COVER |
ALTERNATE |
|
|
MANUAL |
|
|
"ON/OFF" |
|
|
SWITCH |
| |
|
| |
FUSE LINK | HOLD DOWN | |
SCREW | BURNER |
|
|
| |
1ST STAGE |
|
|
ADJUSTMENT | ORFICE |
|
3/32" ALLEN |
| |
|
| |
GAS VALVE |
|
|
| 2ND STAGE |
|
| ADJUSTMENT |
|
| 3/32" ALLEN |
|
| SCREW |
|
MANIFOLD |
| BRACKET |
| BURNER | |
|
| |
| C664400 | SUPPORT |
y | FLUE AND HOOD ILLUSTRATION |
| |
| C664399 |
Page 14