Installation (continued)
Daisy Chaining Plus Cascading Expansion
Physical Interface Expansion
To set up a daisy chained/cascaded installation under Physical Interface Expansion, refer to the diagram below, and do the following:
1.Follow the cabling up procedures given in the Daisy Chaining sections.
2.Power up the daisy chained B060 Series KVM Stations according to the sequence given in the Daisy Chaining section (p. 10).
3.After all the daisy chained B060 Series KVM Stations are up, power up each chain of
4.After all the
B054-001-PS2
B022-016
16