Ultra electronic 155, 105, 80, 230 & -310 Installation certificate, Check-out/startupverification

Models: 230 & -310 105 155 80

1 44
Download 44 pages 30.46 Kb
Page 27
Image 27
Installation certificate

7Manual backgroundManual backgroundManual background GAS-FIRED WATER BOILER SERIES 2 — Boiler Manual

Check-out/startup verification

Installation certificate

Boiler model

__________________

Comments:

CP number

___________

_______________________________________

Date installed

_______________

_______________________________________

Measured Btuh input ____________ Fuel: Natural Gas Propane

_______________________________________

Installation instructions have been followed.

_______________________________________

Check out sequence has been performed.

_______________________________________

Above information is certified to be correct.

_______________________________________

 

 

Information received and left with owner/maintenance person

Installer

________________________________(company) _____________________(phone)

 

________________________________(address)

 

 

________________________________(address)

__________________________________

 

 

(installer’s signature)

Part number 550-100-026/0404

27

Page 27
Image 27
Ultra electronic 155, 105, 80, 230 & -310 manual Installation certificate, Check-out/startupverification