Factory Authorized PowerMax Start-Up

2 9 4 9 5 A irp o rt R o a d , E u g e n e , O R 9 7 4 0 2 T e l:(5 4 1 ) 4 6 1 - 6 0 2 0 F a x :(5 4 1 ) 4 6 1 - 6 0 2 3 T o ll F re e : 1 - 8 0 0 - 6 2 4 - 4 8 0 9

Factory Authorized PowerMax Start-Up

Verification Worksheet

Job Name:______________________________________________________________

Job Location:____________________________________________________________

Dealer Name:___________ Serial # ___________________

! Verify incoming water temperature to booster heater is 110Ε to 140Ε. ! Verify size of vent piping. ____” dia.

! Is there any horizontal vent piping? YES / NO (Circle one) How much? _____ ft.

! Is vent pipe correct pipe for application? ‘Z’-vent Mfg. By Z-Flex U.S., Saf-T-Vent Mfg. By Heat Fab., Inc., or StaR-34 By Flex-L International. All are constructed of AL29- 4Ctm Stainless Steel.

! If an auxiliary power vent is being used, is it installed with an indirect connection, per drawing?

Exhaust Verification Worksheet

!If used, is power vent installed and operating correctly? YES / NO (Circle One)

!Must come on with burner and continue for 4 minutes after burner shutdown.

!Verify electrical connection to unit is correct and to NEC code.

!Verify size, volume, pressure and type of gas supply & that they are in accordance with manufacturers specification: 3.25"w.c. NG or 8"w.c. LP; Check at test port on gas

!

!

!

!

!

!

!

valve.

Verify gas supply pipe size. _____” dia.

Verify pipe size, flow pressure and volume of water supply to unit according to manufacturers specifications. Water supply pipe size. _____” dia.

Does dishwasher have pressure-regulating valve and gauge? Flow rinse pressure must be 18-20 p.s.i. YES / NO (Circle one)

Verify that pipe length from booster accumulator outlet or circulating loop to rinse valve does not exceed 5 feet. (NSF maximum) and is correct diameter (both supply and return)

_____” dia.

Verify that unit has been flushed properly; both water & gas piping. Check all gas connections for leaks.

Check all water connections for leaks.