Vermont Casting 33LDVR, 43LDVR, 39LDVR, 36LDVR Vertical Through-the-RoofApplications, 10007317

Models: 36LDVR 33LDVR 39LDVR 43LDVR

1 40
Download 40 pages 6.57 Kb
Page 18
Image 18
Vertical Through-the-Roof Applications

LDVR Series Direct Vent Gas Fireplace

Zero Clearance Sleeve

(if required) Firestop

7” Pipe

24" (610mm)

Minimum*

7TDVSNORK

(Snorkel)

4” (102mm) Clearance Min.

Manual backgroundManual background Window Manual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual background Well

Manual background Gravel

Vertical Through-the-Roof Applications

This Gas Fireplace has been approved for:

1.Vertical installations up to 40’ (12 m) in height. Up to 10’ (3 m) horizontal vent run can be installed within the vent system using a maximum of three 90° elbows.

Maximum

Drain

Minimum

10’ (3 m)

Foundation Wall

*A minimum of 24” (608mm) vertical pipe must be installed when using 7TDVSNORK Kit.

BG400

8’ (2.4 m) / Maximum

40’ (12 m) Vertical Rise

Manual background Pipe Straps Every 3’ (914 mm)

Fig. 31 Below grade installation.

Do not back fill around snorkel. A clearance of at least 4” (102mm) must be maintained between the snorkel and the soil.

CFM148

Fig. 33 Support straps for horizontal runs.

This Gas Fireplace has been approved for:

Foundation Recess

Recess Brackets

Watertight Seal

Around Pipe

Manual backgroundManual backgroundSnorkel

Manual backgroundManual background Wall Screws

Sheet Metal

Screws

1.Vertical installations up to 40’ (12 m) in height. Up to 10’ (3 m) horizontal vent run can be installed within the vent system using a maximum of three 90° elbows.

2.Up to two 45° elbows may be used within the horizontal run. For each 45° elbow used on the horizontal level the maximum horizontal length must be reduced by 18” (457 mm).

Example: Maximum horizontal length

0 x 45° elbows

=

10’ (3 m)

1 x 45° elbows

=

8¹⁄₂’ (2.6 m)

BG401

Fig. 32 Snorkel installation, recessed foundation.

If the foundation is recessed, use recess brackets (not supplied) for securing lower portion of the snorkel. Fasten brackets to wall first, then secure to snorkel with self drilling #8 x 1/2 sheet metal screws. It will be necessary to extend vent pipes out as far as protruding wall face. (Fig. 32)

2 x 45° elbows = 7’ (2.1 m)

3.A minimum of an 8’ vertical rise.

4.Two sets of 45° elbows offsets within these vertical installations. From 0 to a maximum of 8’ (2.4 m) of vent pipe can be used between elbows. (Fig. 34)

5.7DVCS must be used to support offsets. (Fig. 34) This application will require that you first determine the roof pitch and use the appropriate 7DVSKV (A, B or F). (Refer to Venting Components List, Page 21)

18

10007317

Page 18
Image 18
Vermont Casting 33LDVR, 43LDVR Vertical Through-the-RoofApplications, LDVR Series Direct Vent Gas Fireplace, 10007317