Vermont Casting IRHEDV32 Large Lava Rock Placement, Ceramic Refractory Installation, Maintenance

Models: IRHEDV32

1 27
Download 27 pages 1.99 Kb
Page 10
Image 10
LARGE LAVA ROCK PLACEMENT

LARGE LAVA ROCK PLACEMENT

The large lava rock provided with this fireplace must be placed on the firebox base on either side of the burner assembly.

Under no circumstances should these lava rock be placed on top of the burner assembly.

CERAMIC REFRACTORY INSTALLATION

1.Remove front glass.

2.Remove logs from unit.

3.Remove refractory from package

Refractory are fragile and must be han- dled with care. Where at all possible, two hands should be used when handling.

4.Take centre refractory and tilt so bottom edge slides into support angle in back of fireplace. Fig. 17.

5.Now press centre refractory to back side of fireplace and hold in place.

6.Take left or right refractory and align it so leading edge faces outward. (Place refractory in fireplace side and slide it forward into side support angle on fireplace front. Leading edge of refractory must be completely behind side support angle of IRHEDV32 for proper placement).

7.Now carefully slide in back side of refractory against fireplace side.

8.Repeat steps 6 and 7 for remaining side refractory.

When side refractory is installed correctly, the centre refractory will be supported by the side refractory.

Fig. 17

MAINTENANCE

a. It is important to keep the burner and the burner compartment clean. This must be done periodically, at least once per season. (See Cleaning Procedure).

b.Clean the brass trim using a soft clean cloth, slightly dampened with lemon oil and buff with a soft clean cloth. Do NOT use brass polish or household cleaners as these products will damage the brass trim. Lemon oil can be obtained at supermarkets or hardware stores.

c.The FK24 Fan requires periodic cleaning. Check the area under the control door in front of the fan assembly and wipe or vacuum at least once per month during the operating season.

d.Contact your local representative to arrange an annual service program.

CLEANING PROCEDURE

1.Turn off pilot light at gas valve.

2.Remove front glass.

3.Remove logs.

CAUTION: LOGS MAY BE HOT

4.Vacuum burner compartment especially around orifice/primary air openings.

5.Reinstall logs.

6.Check pilot and main burner operation.

7.Reinstall front glass.

8.Recheck pilot and main burner operation.

9.Check visually the flame pattern and compare with Fig. 20.

10003929

10

Page 10
Image 10
Vermont Casting IRHEDV32 Large Lava Rock Placement, Ceramic Refractory Installation, Maintenance, Cleaning Procedure