Vermont Casting IRHEDV32 installation instructions LINER INSTALLATION - Fig, Venting Diagram

Models: IRHEDV32

1 27
Download 27 pages 1.99 Kb
Page 7
Image 7
LINER INSTALLATION - Fig. 6

LINER INSTALLATION - Fig. 6

VENTING DIAGRAM

The collar extending down from the termi- nation base is the air intake connector. Be sure the flex vent, which is connected to this collar, is also connected to the labelled air intake flue collar on the fireplace. Make sure the Flex vent is attached on the correct collar and cap for exhaust as well.

Slide the insulation provided in the termination kit over the two (2) 3" flex liners, (to be attached to the 3" Flue collar and cap of the termination). Feed one 3" flex vent from the bottom of the termination up through the 4" sleeve. Apply hi-temp sealant on the rain cap collar and slide the flex vent over the end of the rain cap collar fastening with the clamp provided. Slide the flex liner back down the 4" sleeve until 4" cap slides over the sleeve. Attach cap to the sleeve with four (4) screws supplied. Apply hi-temp sealant over the air intake collar and attach intake flex vent in the same method. Feed the two flex liners down the chimney through the damper opening. Tighten termination to the chimney using the screws provided.

Flue gas exits through the vent VENTING DIAGRAMUnder no circumstances should insulation be put between the damper termination rain cap Manual backgroundManual backgroundManual backgroundManual backgroundManual background

Outside combustion air enters through the lower level of the vent termination

Secure with clamp and three screws

1)Attach flexible pipe to rain cap

2)Secure with clamp

3)Attach raincap to vent termination using three screws

Pull flexible pipe through vent termination

A or B vent with

7" 0 inside minimum

and 14" outside maximum

NOTE:

Minimum Vent Height - 12 feet Maximum Vent Height - 35 feet

In case the fireplace opening is only minimum height 21" (533mm) and access from the front is not possible, then follow the instructions below.

1.

Remove flue collar plate assembly. Unbolt the top

 

fastener plate and move it to the back first before

 

sliding the flue collar plate out from the top of the unit.

 

(See Fig. 7)

2.

Apply a bead of hi-temp sealant on the end of the

 

collar before attaching the liner to the flue collar.

 

Fasten it with two clamps then adjust fastener plate all

 

the way to the back before sliding flue gas plate back

 

onto the unit. (See Fig. 8 and Fig. 9).

3.

After the flue collar plate is set on the cabinet top, make

 

sure the front edge of the flue collar plate is completely

 

in contact with the back edge of the cabinet top (See

 

Fig. 10).

EXHAUST

AIR INTAKE

AIR INTAKE COLLAR

EXHAUST COLLAR SECURED

WITH LABEL SECURED

WITH CLAMP AND THREE

WITH CLAMP AND

SCREWS

THREE SCREWS

 

AIR INTAKE

 

Fig. 6

4. Put the machine screw back into the fastener plate.

Bolt the plate until it is locked. (See Fig. 11).

Under no circumstances should insulation be put between the damper

FLUE COLLAR PLATE

FASTENER PLATE

Manual backgroundManual background CABINET TOP MOVE

BACK

and the top of the unit. This may cause condensation and overheating of the unit.

10/24"X 1 1/2" MACHINE SCREW

Fig. 7

10003929

7

Page 7
Image 7
Vermont Casting IRHEDV32 installation instructions LINER INSTALLATION - Fig, Venting Diagram