ELECTRICAL INSTALLATION

Caution – Do not connect the power harness to the board until the installation is ready for verification.

The X-9 Gate Operator requires a single phase AC line to operate and charge the batteries.

1.Turn off the main switch or breaker for the power line being used.

2.Move the selector switch on the Incoming Voltage Selector to the proper position (115 for 110 to 120VAC, 230 for 200 to 240VAC).

3.Connect the incoming power wires to the terminals as shown in the illustration.

4.Turn on the main switch or breaker once the installation is ready for performance check and adjustments.

5.To verify that there is AC power to the system, check that the ‘Charger’ LED on the Control Board is on.

Tips for proper ground installation

A good ground in a gate operator installation will minimize or prevent damage to the operator cause by natural events such as lightning strikes.

The following will provide a guideline for proper grounding:

1.Use a ground rod to provide a ground reference.

2.Consult your city code and be aware of under-ground services in the site of the gate operator to prevent inconveniences.

3.Use always a single bonding point for grounding.

4.All ground wires must be as short and as thick as possible.

5.Prevent unnecessary turns or loops in all ground wires.

TECHNICAL SUPPORT 1 800 908 0884

Power Harness

Auxiliary Power Connection. See page 29 for further details.

White

Green24VAC

Red

BlackBAT

24V

To

Transformer

3A FUSE

Part # VAEMI

 

 

P

N

 

o

 

w

e

 

 

e

u

H

r

t

G

r

o

a

r

l

t

o

u

 

 

n

 

 

d

Earth Ground

Ground Rod

EMI

Board

E

a

r t

h

G

r o u n d

17