![](/images/new-backgrounds/1074224/742245x1.webp)
TABLE OF CONTENTS |
|
GENERAL | 5 |
SPECIFICATIONS | 5 |
OPTIONS AND FEATURES | 6 |
BATTERY CONFIGURATIONS | 6 |
8 | |
8 | |
GR SERIES FRYMATE (Dump Station) | 8 |
INSTALLATION | 9 |
UNPACKING | 9 |
LOCATION | 10 |
INSTALLATION CODES AND STANDARDS | 10 |
ASSEMBLY | 11 |
GAS CONNECTIONS | 12 |
GAS PRESSURES AND ORIFICES | 12 |
TESTING THE GAS SUPPLY PIPING SYSTEM | 12 |
LEVELING FRYER | 13 |
FLUE CONNECTIONS | 13 |
ELECTRICAL CONNECTIONS | 13 |
OPERATION | 14 |
BEFORE FIRST USE | 14 |
FILLING FRY TANK WITH SHORTENING | 14 |
LIGHTING INSTRUCTIONS FOR MANUAL PILOT IGNITION | 15 |
STARTUP WITH ELECTRONIC IGNITER | 16 |
GRD SERIES | 17 |
CONTROLS | 17 |
PROGRAMMING | 18 |
USING THE FRYER (AFTER STARTUP) | 20 |
SHUTDOWN | 20 |
EXTENDED SHUTDOWN | 20 |
– 3 –