VHX SERIES STEAMER - SERVICE PROCEDURES AND ADJUSTMENTS
HEATING ELEMENT TEST
VOLTAGE | KW PER | AMPS PER | OHMS PER | |
ELEMENT | ELEMENT | ELEMENT | ||
| ||||
208 | 9.0 | 14.4 | 14.4 | |
|
|
|
| |
240 | 9.0 | 12.5 | 19.2 | |
|
|
|
| |
480 | 9.0 | 6.3 | 76.8 | |
|
|
|
| |
208 | 10.5 | 16.9 | 12.4 | |
208 | 12.0 | 19.3 | 10.8 | |
|
|
|
| |
240 | 12.0 | 16.7 | 14.4 | |
|
|
|
| |
480 | 12.0 | 8.3 | 57.6 | |
|
|
|
| |
NOTES: | 1. Values in the table are nominal. | |||
| Tolerance is |
|
2.Voltage values are @ 60HZ.
3.Resistance values (ohms) are @ room temperature. If heating elements are
above room temperature, the measured resistance will be greater.
4.Each heating element has 3 separate internal elements.
1.Access the heating elements as outlined in
REMOVAL AND REPLACEMENT OF PARTS.
2.Measure voltage at heating element terminals and verify it against data plate voltage.
A.If voltage is incorrect, see
TROUBLESHOOTING.
B.If voltage is correct, continue with procedure.
3.Check current draw (amps) through the heating element lead wires.
NOTE: Checking current draw is the preferred method over a resistance check when a clamp on type amp meter is available.
A.If current draw is correct then heating element is functioning properly. See table for proper values.
B.If current draw is not correct, turn power switch off and disconnect the electrical supply.
1)Install a replacement heating element.
C.If unable to check current draw, a resistance check may indicate a malfunctioning element.
1)Turn power switch off and disconnect power to machine.
2)Remove lead wires from heating element and check resistance (ohms). See table for proper values.
4.Check for proper operation.
COOKING COMPARTMENT
NOTE: Before proceeding with intake
Intake Shut-Off Valve Adjustment (Steam Flow)
1.Remove right side compartment panel.
2.Allow boiler to fully pressurize (heat turns off).
NOTE: The intake
3.Turn both cooking compartment timers on.
4.Open the intake
5.Slowly begin to close the intake
6.Monitor manifold pressure gauge reading for two complete boiler cycles.
A.If the manifold pressure gauge reading stays within tolerance while the boiler is cycling, the intake
B.If the manifold pressure gauge reading is outside of the tolerance repeat the adjustment.
7.Once the steam supply manifold pressure is set correctly, turn both cooking timers off and install right side compartment panel.
F25154 (February 2004) |