www.vxitech.com

SECTION 3

OPERATION

INTRODUCTION

There are no operating instructions required for the CT-100B VXIbus chassis. After the chassis is installed, operation is completely transparent to the operator. Just plug in the instruments then power up the chassis. The power supply lines are monitored and displayed on the front panel to provide user feedback of correct operation (see Figure 3-2).

FIGURE 3-1CT-100BSIX-SLOT CHASSIS W/ INSTALLED INSTRUMENTS

CT-100B Operation

31

Page 31
Image 31
VXI Six-Slot VXIBus Chassis user manual Operation, 1CT-100BSIX-SLOT Chassis W/ Installed Instruments