16.Press a 40mm x 50mm Inner Cap (21) into the Right Butterfly Arm (26). Wet the lower end of the Arm and a Long Pad (54) with soapy water. Slide the Pad onto the Arm.

Attach a Press Handle (27) to the Right Butterfly Arm (26) with two M8 x 20mm Button Head Screws (51). Slide the Long Pad (54) down so that the bot- tom is flush with the lower end of the Arm. Wet the Press Handle with soapy water. Slide a Long Handgrip (28) onto the Press Handle. Press a 25mm Round Inner Cap (29) into the Press Handle.

Lubricate an M10 x 50mm Bolt (100) with grease. Attach a Pivot Bracket (70) to the Right Butterfly Arm (26) with the Bolt and an M10 Nylon Locknut (87). Do not overtighten the Nylon Locknut; the

Pivot Bracket must be able to pivot easily. Repeat this step with the Left Butterfly Arm (25).

17.Lubricate an M10 x 80mm Button Head Bolt (104) and both sides of two Plastic Washers (56) with grease. Attach the Right Butterfly Arm (26) to the Butterfly Frame (47) with the Bolt, the two Plastic Washers, two Butterfly Caps (57), two M10 Washers (91), and an M10 Nylon Locknut (87) as shown.

Make sure that the recessed sides of the Plastic Washers are fitted over the welded bushing in the Butterfly Arm. Do not overtighten the Locknut; the Butterfly Arm must be able to pivot easily.

Repeat this step with the Left Butterfly Arm (25).

16

 

Lubricate

 

 

 

 

 

 

26

 

100

 

 

 

70

 

 

 

 

 

 

 

 

87

 

51

 

21

 

 

 

 

 

 

 

29

 

 

54

 

 

 

25

 

 

28

 

 

 

 

27

 

 

17

 

 

 

 

 

 

104

 

 

26

56

91

 

 

 

 

 

 

 

57

47

 

 

 

 

 

 

57

 

 

 

 

91

 

25

 

 

87

 

18.

CABLE ASSEMBLY

IMPORTANT: Refer to the Cable Identification Chart on page 26 for help identifying the cables. Do not overtighten the bolts and nuts attaching the pulleys. The pulleys must be able to turn freely.

18

 

 

 

 

 

 

 

 

 

 

 

 

 

78

 

 

74

 

 

 

 

Locate and open the parts bags labeled “CABLE ASSEMBLY” and “PULLEYS.”

Lubricate the M10 x 165mm Bolt (30) with grease. Attach the Swivel Cage (76) to the Swivel Carriage (46) with the Bolt and an M10 Nylon Locknut (87).

Locate the Swivel High Cable (74), which is 3213mm long and has a ball on one end and a threaded bolt on the other end. Wrap the Cable around a 90mm Pulley (78). Attach two Pulleys to the Swivel Cage (76) with two M10 x 45mm Bolts (93) and two M10 Nylon Locknuts (87).

11

30

87

78

93

76

46

87

Page 11
Image 11
Weider WESY39523 user manual Cable Assembly