Weil-McLain 80 Connect steam boiler piping continued, Installation Start-Up Maintenance Parts

Models: 80

1 40
Download 40 pages 58.65 Kb
Page 17
Image 17
8 Connect steam boiler piping (continued)

• Installation • Start-Up • Maintenance • Parts

8 Connect steam boiler piping (continued)

Figure 15 Model 380 through 580 steam boiler piping — NOTE minimum 24 inches between boiler water line and bottom of header.

Figure 16 Model 680 through 980 steam boiler piping — NOTE minimum 24 inches between boiler water line and bottom of header.

Part No. 550-141-935/0602

17

Page 17
Image 17
Weil-McLain 80 Connect steam boiler piping continued, Installation Start-Up Maintenance Parts, Part No. 550-141-935/0602