Manuals
/
Weil-McLain
/
Household Appliance
/
Water Heater
Weil-McLain
80 manual Parts continued, Installation Start-Up Maintenance Parts
Models:
80
1
37
40
40
Download
40 pages
58.65 Kb
33
34
35
36
37
38
39
40
<
>
Install
Jacket top panel placement
Warranty
Dimension
Wiring and fuel piping
For block assembly
Make final adjustments continued
Gross output = GPM Temperature rise
If using tankless heater TI sections
Page 37
Image 37
• Installation •
Start-Up
• Maintenance • Parts
18
Parts
(continued)
Part No.
550-141-935/0602
37
Page 36
Page 38
Page 37
Image 37
Page 36
Page 38
Contents
Boiler Manual
INSTALLER USER
80Water & steam boilers
Before installing boiler
Contents
Complete block assembly
Install flue collector
Installation must comply with
1 Before installing boiler
Before selecting boiler location
Lay a foundation, if needed
Provide combustion and ventilation air openings
1 Before installing boiler continued
2 Set boiler in place
For block assembly
For packaged boiler
Installation Start-Up Maintenance Parts
3 Assemble block
Install back refractory blanket
Prepare back section
If using tankless heater TI sections
Install intermediate sections
3 Assemble block continued
Prepare remaining sections
Prepare boiler and test
4 Perform hydrostatic pressure test
Install burner mounting plate on front section
5 Complete block assembly
Install cleanout plates
Installation Start-Up Maintenance Parts
Flue collector assembly
6 Install flue collector
Install collector hold-downbolts
Prepare flue collector hood assembly
Installation Start-Up Maintenance Parts
6 Install flue collector continued
Part No. 550-141-935/0602
After installing flue collector, ALL BOILERS
Before installing flue collector
Rear flue boilers only
Top flue boilers only
Installation Start-Up Maintenance Parts
6 Install flue collector continued
Part No. 550-141-935/0602
7 Connect water boiler piping
Install piping
General water piping information
Table 6 Recommended minimum pipe sizes for
Installation Start-Up Maintenance Parts
7 Connect water boiler piping continued
Gross output = GPM Temperature rise
Figure 13 Multiple water boiler piping
General steam piping information
8 Connect steam boiler piping
Figure 14 Cold water fill piping
Installation Start-Up Maintenance Parts
8 Connect steam boiler piping continued
Part No. 550-141-935/0602
Figure 18 Condensate piping to boiler
8 Connect steam boiler piping continued
Table 9 Condensate receiver capacity
Part No. 550-141-935/0602
8 Connect steam boiler piping continued
Installation Start-Up Maintenance Parts
Separate feed pumps and check valves for each
Before installing jacket
9 Install jacket
Install support brackets and rails
Install jacket front and rear panels
Installation Start-Up Maintenance Parts
9 Install jacket continued
Part No. 550-141-935/0602
Install jacket top panels
Install jacket side panels
Install jacket trim
9 Install jacket continued
Installation Start-Up Maintenance Parts
9 Install jacket continued
Part No. 550-141-935/0602
Part No. 550-141-935/0602
9 Install jacket continued
Installation Start-Up Maintenance Parts
9 Install jacket continued
Part No. 550-141-935/0602
Figure 25 Jacket top panel placement
9 Install jacket continued
Part No. 550-141-935/0602
To pipe tankless heaters
10 Pipe tankless heaters
Installation Start-Up Maintenance Parts
Hot water can scald
Install controls
11 Install water boiler controls
Install controls
12 Install steam boiler controls
Installation Start-Up Maintenance Parts
Table 12 Steam control tappings see Figure
Part No. 550-141-935/0602
12 Install steam boiler controls continued
Figure 29 Steam control siphon and fittings
Table 13 Water level control locations
General venting information
13 Connect breeching and venting systems
Construct metal breeching
Select type of venting system
15 Wiring and fuel piping
14 Install burner
16 Make final adjustments
To install burner
Freeze protection when used
16 Make final adjustments continued
Skim steam boilers
Check boiler for gas-tightseal
17 Dimensions and ratings
Installation Start-Up Maintenance Parts
17 Dimensions and ratings continued
Part No. 550-141-935/0602
Part No. 550-141-935/0602
18 Parts
18 Parts continued
Installation Start-Up Maintenance Parts
Part No. 550-141-935/0602
Handling ceramic fiber and fiberglass materials
Installation Start-Up Maintenance Parts
Propane boilers - propane gas odorant
Residential & Commercial Cast Iron Boilers
Weil-McLainLimited Warranty for