Manuals
/
Weil-McLain
/
Household Appliance
/
Water Heater
Weil-McLain
80 manual Dimensions and ratings continued, Installation Start-Up Maintenance Parts
Models:
80
1
35
40
40
Download
40 pages
58.65 Kb
32
33
34
35
36
37
38
39
<
>
Install
Jacket top panel placement
Warranty
Dimension
Wiring and fuel piping
For block assembly
Make final adjustments continued
Gross output = GPM Temperature rise
If using tankless heater TI sections
Page 35
Image 35
• Installation •
Start-Up
• Maintenance • Parts
17
Dimensions and ratings
(continued)
Part No.
550-141-935/0602
35
Page 34
Page 36
Page 35
Image 35
Page 34
Page 36
Contents
80Water & steam boilers
INSTALLER USER
Boiler Manual
Install flue collector
Contents
Before installing boiler
Complete block assembly
Lay a foundation, if needed
1 Before installing boiler
Installation must comply with
Before selecting boiler location
Provide combustion and ventilation air openings
1 Before installing boiler continued
Installation Start-Up Maintenance Parts
For block assembly
2 Set boiler in place
For packaged boiler
Prepare back section
Install back refractory blanket
3 Assemble block
Prepare remaining sections
Install intermediate sections
If using tankless heater TI sections
3 Assemble block continued
Prepare boiler and test
4 Perform hydrostatic pressure test
Installation Start-Up Maintenance Parts
5 Complete block assembly
Install burner mounting plate on front section
Install cleanout plates
Prepare flue collector hood assembly
6 Install flue collector
Flue collector assembly
Install collector hold-downbolts
Part No. 550-141-935/0602
6 Install flue collector continued
Installation Start-Up Maintenance Parts
Top flue boilers only
Before installing flue collector
After installing flue collector, ALL BOILERS
Rear flue boilers only
Part No. 550-141-935/0602
6 Install flue collector continued
Installation Start-Up Maintenance Parts
Table 6 Recommended minimum pipe sizes for
Install piping
7 Connect water boiler piping
General water piping information
Figure 13 Multiple water boiler piping
7 Connect water boiler piping continued
Installation Start-Up Maintenance Parts
Gross output = GPM Temperature rise
Figure 14 Cold water fill piping
8 Connect steam boiler piping
General steam piping information
Part No. 550-141-935/0602
8 Connect steam boiler piping continued
Installation Start-Up Maintenance Parts
Part No. 550-141-935/0602
8 Connect steam boiler piping continued
Figure 18 Condensate piping to boiler
Table 9 Condensate receiver capacity
Separate feed pumps and check valves for each
Installation Start-Up Maintenance Parts
8 Connect steam boiler piping continued
Install jacket front and rear panels
9 Install jacket
Before installing jacket
Install support brackets and rails
Part No. 550-141-935/0602
9 Install jacket continued
Installation Start-Up Maintenance Parts
9 Install jacket continued
Install jacket side panels
Install jacket top panels
Install jacket trim
Part No. 550-141-935/0602
9 Install jacket continued
Installation Start-Up Maintenance Parts
Part No. 550-141-935/0602
9 Install jacket continued
Part No. 550-141-935/0602
9 Install jacket continued
Installation Start-Up Maintenance Parts
Part No. 550-141-935/0602
9 Install jacket continued
Figure 25 Jacket top panel placement
Hot water can scald
10 Pipe tankless heaters
To pipe tankless heaters
Installation Start-Up Maintenance Parts
Install controls
11 Install water boiler controls
Table 12 Steam control tappings see Figure
12 Install steam boiler controls
Install controls
Installation Start-Up Maintenance Parts
Table 13 Water level control locations
12 Install steam boiler controls continued
Part No. 550-141-935/0602
Figure 29 Steam control siphon and fittings
Select type of venting system
13 Connect breeching and venting systems
General venting information
Construct metal breeching
To install burner
14 Install burner
15 Wiring and fuel piping
16 Make final adjustments
Check boiler for gas-tightseal
16 Make final adjustments continued
Freeze protection when used
Skim steam boilers
17 Dimensions and ratings
Part No. 550-141-935/0602
17 Dimensions and ratings continued
Installation Start-Up Maintenance Parts
Part No. 550-141-935/0602
18 Parts
Part No. 550-141-935/0602
Installation Start-Up Maintenance Parts
18 Parts continued
Handling ceramic fiber and fiberglass materials
Installation Start-Up Maintenance Parts
Propane boilers - propane gas odorant
Residential & Commercial Cast Iron Boilers
Weil-McLainLimited Warranty for