Manuals
/
Weil-McLain
/
Household Appliance
/
Boiler
Weil-McLain
CGS-4E
manual
Sizing air openings for CGs-4E installations
Models:
CGS-4E
1
11
64
64
Download
64 pages
43.95 Kb
8
9
10
11
12
13
14
15
<
>
Troubleshooting
Install
9b Operation wiring diagrams
Field wiring
Dimension
Base assembly
Check-out procedure checklist
Valve adjustment
Check pressure switch setting
Temperature gauges
Page 11
Image 11
GOLD
CGs-4E
Gas-Fired
Water Boiler — Boiler Manual
Figure 3
Sizing air openings for
CGs-4E
installations
✷
Part number
550-110-282/1108
11
Page 10
Page 12
Page 11
Image 11
Page 10
Page 12
Contents
GOLDCGs-4E
How it works
Gold CGs-4EGas-Fired Induced-Draft Water Boiler
Contents
User
Installer
Please read before proceeding
Before locating the boiler, check the following
1a Prepare boiler location codes & checklist
Installations must follow these codes
1b Prepare boiler location clearances
Vent system
When removing boiler from an existing common vent system
1c Prepare boiler location vent system
CGs-4E special vent system
Areas likely to have contaminants
1d Prepare boiler location contamination
Products to avoid
Sizing air openings
1e Prepare boiler location air openings
Combustion air requirements
Special considerations
Sizing air openings for CGs-4E installations
Inspect orifices and burners
2a Prepare boiler placement & setup
Orifice replacement procedure
Place boiler/crate near position
Prepare boiler for test
2b Prepare boiler pressure test
Hydrostatic pressure test
Drain and remove fittings
3a Water piping general information
3b Water piping single-zone system
Install an automatic air vent in air vent tapping as shown
Piping multiple zones
3c Water piping multiple zones
Fill valve
Boiler isolation balancing valves Flow/check valve
System or zone circulator Zone valve Drain valve
Relief valve
Primary/secondary preferred bypass piping method
Temperature gauges
Valve adjustment Figures 8 and 9 only
3d Piping low temp systems
Boiler isolation balancing valves
Blend temperature gauge
BOILER-bypass piping method
Valve adjustment
Figures 8
SYSTEM-bypass piping method
Boiler
3e Water piping refrigeration systems
Prevent chilled water from entering
Combustion air openings Combustion air quality
Venting and combustion air
Vent system
Propane Gas
Connecting gas supply piping to boiler
Gas piping
Natural Gas
Thermostat
Field wiring
Electrical installation must comply with
Wiring connections
Check for gas leaks
Freeze protection when used
7a Start-up preparation
Determine if water treatment is needed
Start the boiler
7b Start-up operate boiler
Inspect system water piping Inspect base insulation
Final check before starting boiler
Main burner flame Figure
Check burner flames
Pilot burner flame Figure
Gas not turned on at meter or boiler?
If none of the above corrects the problem, refer to
7c Start-up if boiler doesn’t start
Check for
Installation and service certificate
Check-out procedure checklist
Boiler is now in the off cycle
9a Operation sequence
Sequence returns to step
Operation sequence
Wiring diagram
9b Operation wiring diagrams
9c Operating instructions CGs-4E
CMR 5.082a1 through
Addendum Instruction for Commonwealth of Massachusetts
CMR 5.082a 1 through
Exemptions The following equipment is exempt from
10a Service and maintenance schedule
10b Service & maintenance annual start-up
Inducer motor
With boiler power off, place a few drops of S.A.E
Burners, base and inlet air box
Condensate drain system
10b Service & maint. annual start-up
Relief valve, typical
Boiler relief valve
Place newspapers in base of boiler to collect soot
Clean between sections with wire flue brush
Review with owner
Shut down boiler
Can result
11a Troubleshooting procedure
Before troubleshooting
Check the following
Troubleshooting air pressure reading
11b Troubleshooting air pressure switch
Air pressure switch
Check pressure switch setting
Troubleshooting the control module
11c Troubleshooting control module
Control indicator lights Lockout modes
Control indicator lights NON-LOCKOUT modes
Control module connections
Chart 1 Troubleshooting Power light status
11d Troubleshooting control module lights
Chart 2 Tstat Circ & Power lights flashing
Chart 3 Press Switch & Power lights flashing
Chart 4 Flame & Power lights flashing
Does blower motor operate?
Item 8 ,
Verify Sequence of operation, ,
Weil-McLain part numbers are found in Weil-McLain Boilers
12a Replacement parts
Section assembly Base Jacket Trim Controls
Weil-McLain part number
12b Replacement parts section assembly
Base assembly
12c Replacement parts base
Description Weil-McLain Part number
Jacket assembly
12d Replacement parts jacket
Boiler
Fittings shown are factory-installed on boiler
12e Replacement parts trim
Propane gas components
12f Replacement parts controls
Dimensional drawing
13a Dimensions
Tested for 50 psi working pressure
13b Ratings
Eye Irrigate immediately Breathing Fresh air
Handling ceramic fiber and fiberglass materials
This type of respirator is based on
Top
Page
Image
Contents