Through-the-wall Installation Instructions
...for slide out chassis model only.
1l Pick the right wall. First, decide what room(s) you want to cool. Then choose a wall that
will allow the
TRICAL REQUIREMENT pages for type of receptacle and wiring needed.) Do not use an extension cord. (CAUTION: DO NOT LOCATE
AIR CONDITIONER WHERE PLASTIC CABINET FRONT WILL BE EXPOSED TO A HEAT SOURCE THAT RAISES THE
SURFACE TEMPERATURE IN EXCESS OF 120” F.)
2l Choose the type of decorative molding you want to use around the room side of the cabi- net. Your choice affects the finish frame alignment with the inside wall. When using a wood, metal or plastic molding, the finish frame should almost line up with the inside wall. If the wall is plastered to the cabinet and no molding is used, the finish frame must be set into the wall by l/2” (see Figure 20 for
frame construction or Figure 21 for brick
veneer construction). Cut through two studs for support.
CAUTION:
l
l
Be sure air conditioner does not fall during installation.
Handle the air conditioner with care. Watch out for the sharp metal fins on the front and rear coils.
lDo not use the collected water for drinking purposes. It is not sanitary.
3l Provide an opening through the wall for a finish frame. Observe all local governing codes and ordinances. For wall opening dimensions,