6. Run the electrical line into evaporator on bottom of left side over insulation.

Wires should be at least 36” long going into the cabinet.

7. Re-install interior assembly.

Slide interior assembly back into housing gently. Re-attach using the two screws. Flow a small amount of dry nitrogen through the tubing during brazing. This is to displace oxygen and prevent the formation of copper oxide. The solenoid should be energized for a free flow without building up pressure in the tubing.

-15-

Page 15
Image 15
WhisperKool SS7000, SS4000 owner manual Re-install interior assembly