White Rodgers 1F94-71 manual 4a. What time does the building become vacant?

Models: 1F94-71

1 40
Download 40 pages 21.95 Kb
Page 19
Image 19
4a. What time does the building become vacant?

2a. What time do the building occupants reach a maximum activity level (using lights, equip- ment, meeting rooms, etc.)?

b.What temperature should the building be at this time?

3a. What time do the building occupants reach a minimum activity level (limited personnel in building)?

b.What temperature should the building be at this time?

4a. What time does the building become vacant?

b.What temperature should the building be at this time?

IN YOUR HOME:

5a. What time does the first person get up in the morning?

b.What temperature should the house be at this time?

6a. What time does the last person leave the house in the morning?

b.What temperature should the house be at this time?

7a. What time does the first person arrive home in the evening?

b.What temperature should the house be at this time?

8a. What time does the last person go to bed at night?

b.What temperature should the house be at this time?

Now look at the factory preprogrammed times and temperatures shown on the following page. If this program will suit your needs, simply press

RUN

to begin running the factory preset pro-

PRGM

gram.

19

Page 19
Image 19
White Rodgers 1F94-71 manual 4a. What time does the building become vacant?