Assemble Hoses
1.Attach a 90° elbow (2) and male quick coupler (3) to each loader supply hose (1). See Figure 13.
2.Connect loader supply hoses to loader feedlines as shown in Figure 14.
3
2
1
Figure 13. Hose Assembly
1.53670 Hose, 150" x 3/4 JICM x 3/4 JICM
2.313053 Elbow, 3/4 JICF x 1/2 NPTM
3.66511 Quick coupler, male 1/2 NPT
(not included in kit)
B A
1020/1027
Right
Loader
Boom
D C
LOADER FEEDLINES
Figure 14. 1020/1027 Loader Feedline Connections
Install Hose Hanger
Attach hose hanger (4) to frame rail under right side of cab. Secure into position using cap screw (6), flat washer (7), and hex nut (8).
4.58033 Hose hanger
5.58047 1/4 x
6.30577 M8 x 1.25P x 25 mm Cap screw
7.4378 5/16 Flat washer
8.30515 M8 x 1.25P Hex nut
| 6 |
| 5 |
| 7 |
4 | 8 |
M5339 |
|
Figure 15. Hose Hanger Installed
10 Hydraulic Installation | MAN0469 (9/9/2005) |
|
|