Woods Equipment 211822 Hydraulic Installation, Verify Control Movements, Tractor Remote Couplers

Models: 211822

1 18
Download 18 pages 7.57 Kb
Page 12
Image 12
Verify Control Movements

Verify Control Movements

1.Mount loader to tractor: Remove mount pins from loader uprights. Align tractor with loader and slowly drive tractor into loader. Shut off tractor.

2.Connect loader feedline hoses to tractor remote control couplers. See Figure 18 and Figure 19.

3.Comply with all safety rules and start the tractor.

4.Mount loader to tractor by activating bucket cylinders to raise or lower the loader uprights into the loader mounts. Slowly advance tractor forward, activating appropriate cylinders to engage loader completely into mounts. Insert mounting pins to secure loader.

5.Check that all tractor hydraulic control lever positions operate the loader movements correctly. See Figure 20.

6.If loader movements do not respond correctly, shut off tractor, relieve pressure, and reconnect properly. Loader control movements must be correct before proceeding.

7.Once all loader functions are correct, start the tractor and operate the loader to check for leaks. Purge any remaining air from the hydraulic system and check oil level.

8.When hose routings and correct loader operations are verified, identify each circuit by placing a matching colored band around the male and female quick-disconnect coupler. The color-coded bands will make reinstallation easier when the loader is removed from tractor.

9.Attach the plastic tie straps (included in kit) every 20-inches around the hoses to keep them tightly bundled and away from contact with the ground or other moving parts on the tractor or loader.

10.Before operating the loader, make sure that the Pre-Delivery, Delivery, and Pre-Operation Check Lists from the Loader Operator’s Manual have been completed.

Handle - 2 Handle - 1

AC

BD

Tractor Remote Couplers

 

A - BUCKET CYL. BASE END (DUMP)

 

B - BUCKET CYL. ROD END (ROLLBACK)

 

C - BOOM CYL. ROD END (DOWN)

 

D - BOOM CYL. BASE END (UP)

LA6

Figure 19. Loader Feedline Connections

Control Handle 2

Control Handle 1

DP9

Control 1, Handle forward - Boom down

Control 1, Handle back - Boom up

Control 2, Handle forward - Dump bucket or attachment

Control 2, Handle back - Rollback bucket or attachment

Figure 20. Two Handle Hydraulic Control Levers

12 Hydraulic Installation

MAN0469 (9/9/2005)

 

 

Page 12
Image 12
Woods Equipment 211822 installation manual Hydraulic Installation, Verify Control Movements, Handle - 2 Handle - AC BD