Genie TMZ-17, TMZ-10, TMZ-50, TMZ-30 manual Pre-operation Inspection, PRE-OPERATION Inspection

Page 15

First Edition • Third Printing

Operator's Manual

 

 

 

 

Pre-operation Inspection

oBe sure that the operator's, safety and responsibilities manuals are complete, legible and in the storage container located on the platform.

oBe sure that all decals are legible and in place. See Decals section.

oCheck for hydraulic oil leaks and proper oil level. Add oil if needed. See Maintenance section.

oModels with engines: Check for engine oil leaks and proper fluid level. Add oil if needed. See Maintenance section.

oCheck for battery fluid leaks and proper fluid level. Add distilled water if needed. See Maintenance section.

oCheck for proper tire pressure and lug nut torque. Add air to tires if needed. See Maintenance section.

Check the following components or areas for damage, modifications and improperly installed or missing parts:

oElectrical components, wiring and electrical cables

oHydraulic pump(s), reservoir, hoses, fittings, cylinders and manifolds

oFuel tank (if equipped)

oEngine and related components (if equipped)

oBoom components and wear pads

oTires and wheels

oTrailer lights and reflectors

oParking brake components

oOutriggers and foot pads

oAlarms and horn

oNuts, bolts and other fasteners

PRE-OPERATION INSPECTION

oPlatform entry mid-rail/gate

oSurge brake components (if equipped)

oSafety chains (if required)

oMechanical brake components (if equipped)

oBeacon and alarms (if equipped)

Check entire machine for:

oCracks in welds or structural components

oDents or damage to machine

oBe sure that all structural and other critical components are present and all associated fasteners and pins are in place and properly tightened.

oBe sure that the machine is properly configured for use.

Personnel lifting configuration: Be sure the platform is properly installed.

Material lifting configuration: Be sure the material lifting hook is properly installed.

oBe sure that the batteries are in place and properly connected.

oModels equipped with hydraulic surge brake systems: Check the hydraulic oil level in the surge brake. Check for leaks.

oAfter you complete your inspection, be sure that all compartment covers are in place and latched.

Part No. 72896

Genie TMZ-50/30 & Genie TMZ-17/10

13

Image 15
Contents Operator’s Manual Contact us ContentsDo Not Operate Unless Safety RulesTip-over Hazards Electrocution HazardsBodily Injury Hazard Explosion and Fire Hazards Collision HazardsComponent Damage Hazards Lifting HazardsTowing Hazards Damaged Machine HazardsCollision Hazard Personnel Lifting Configuration Tip-over HazardsMaterial Lifting Configuration Collision Hazards Fall HazardsDecal Legend Optional Drive System Tip over HazardsLifting Hazard Battery Safety Burn HazardsExplosion Hazards Tip-over HazardPlatform Control Panel ControlsGround Control Panel Drive Control Panel option Fundamentals Pre-operation InspectionPRE-OPERATION Inspection Pre-operation InspectionMaintenance Maintenance Symbols LegendCheck the Hydraulic Oil Level Observe and Obey Engine Models Check the Engine Oil LevelCheck the Tires and Wheels Scheduled MaintenanceSetup Function TestsFunction Tests Test the Boom Functions At the Ground ControlsTest Emergency Stop Test Outrigger InterlockTest the Drive and Steering If equipped At the Platform ControlsTest the Horn Test Machine FunctionsWorkplace Inspection Workplace InspectionOnly use the machine as it was intended Set upOperating Instructions Emergency StopTowing Information TransportAll other functions Models with Engines Manual LoweringDC Models Manual Lowering Primary boom retract functionOperation from Ground Operation from PlatformTo Position Platform After Each Use Optional Drive System Operating InstructionsBacking Up with Trailer If equipped with surge brake Transport Not attached to a tow vehicleMaterial Lifting Configuration Set up Material Lifting Configuration Observe and ObeyVoltage Conversion Battery and Charger Instructions Observe and ObeyDry Battery Filling Charging Instructions To Charge BatteryDecal Inspection DecalsDecals Specifications Reporting Safety Defects Reporting Safety DefectsGenie Industries PO Box Redmond, WA Distributed By