Generac QT 5.4L owner manual ‹ Fuel Requirements, ‹ Natural GAS Fuel System, ‹ LP Fuel System

Page 9

Standby Generator Sets

Fuel Systems

FUEL SYSTEM

‹FUEL REQUIREMENTS

The standby generator may be equipped with one of the following fuel systems:

Natural gas fuel system

Propane vapor (PV) fuel system

Liquid propane (LP) fuel system

The Manual Drawing Listing that is affixed to the unit includes the “Identification Code,” which may be used to identify the type of fuel system installed on the unit.

Recommended fuels should have a Btu content of at least 1,000 Btu's per cubic foot for natural gas; or at least 2,520 Btu's per cubic foot for LP gas. Ask the fuel supplier for the Btu content of the fuel.

Required fuel pressure for natural gas is 11 inches to 14 inches water column (0.4 to 0.5 psi); and for liquid propane, 11 inches to 14 inches of water column (0.4 to 0.5 psi).

NOTE:

Any piping used to connect the generator to the fuel supply should be of adequate size to ensure the fuel pressure NEVER drops below 11 inches water column for natural gas or 11 inches water column for liquid propane for all load ranges.

NOTE:

It is the responsibility of the installer to make sure that only the correct recommended fuel is sup- plied to the generator fuel system. Thereafter, the owner/operator must make certain that only the proper fuel is supplied.

‹NATURAL GAS FUEL SYSTEM

Natural gas is supplied in its vapor state. In most cases, the gas distribution company provides piping from the main gas distribution line to the standby generator site. The following information applies to natural gas fuel systems.

Gas pressure in a building is usually regulated by national, state and local codes.

To reduce gas pressure to a safe level before the gas enters a building, a primary regulator is needed. The natural gas supplier may or may not supply such a regulator.

It is the responsibility of the gas supplier to make sure sufficient gas pressure is available to operate the primary regulator.

Gas pressure at the inlet to the fuel shutoff sole- noid should not exceed approximately 14 inches water column (0.5 psi). Optimum pressure at the fuel shutoff solenoid is 11 inches water column (0.4 psi).

‹PROPANE VAPOR WITHDRAWAL FUEL SYSTEM

This type of system utilizes the vapors formed above the liquid fuel in the supply tank. Approximately 10 to 20 percent of the tank capacity is needed for fuel expansion from the liquid to the vapor state. The vapor withdrawal system is generally best suited for smaller engines that require less fuel. The installer should be aware of the following:

The natural gas and LP gas systems are similar. However, the natural gas system delivers gas at a pressure of approximately five inches water col- umn to the carburetor.

When ambient temperatures are low and engine fuel consumption is high, the vapor withdrawal system may not function efficiently.

Ambient temperatures around the supply tank must be high enough to sustain adequate vaporiza- tion, or the system will not deliver the needed fuel volume.

In addition to the cooling effects of ambient air, the vaporization process itself provides an additional cooling effect.

‹LP FUEL SYSTEM

LP is supplied as a liquid in pressure tanks. It is usually made up of propane, butane, or a mixture of the two gases. Propane tends to vaporize readily even at temperatures as low as -20° F (-29° C). However, butane reverts to its liquid state when temperatures drop below 32° F (0° C).

LP in a liquid withdrawal system must be converted to its gaseous state before it is introduced into the engine carburetor. A vaporizer-converter is generally used to accomplish this. In such a converter, heated engine coolant is ported through the converter to provide the necessary heat for conversion of the fuel from a liquid to a gaseous state.

5-1

05/06 A .Rev FuelSys002

Image 9
Contents QT 5.4L 100kW Models Standby Generator Sets Table of Contents  Warning   Electrical Hazards  ‹ HOW to Obtain Service ‹ Operation and MaintenanceAuthorized Service Dealer Location Introduction‹ Data Label Identification RecordEquipment Description Engine OIL RecommendationsCoolant Recommendations Engine Protective Devices ‹ Fuel Requirements Fuel System‹ Natural GAS Fuel System ‹ LP Fuel SystemSpecifications Interconnections ‹ Cold Weather KIT‹ Ignition Shutdown on Loss of Crank or CAM Signals ‹ Ignition POWER-UP Input 56 Line Input‹ Ignition Enable 14 Line Input 4L & 6.8L Ignition Description‹ FOUR-LEAD, SINGLE-PHASE Stator Alternator Power Winding Connections‹ 3-PHASE Alternators Generator AC Lead ConnectionsInstallation Preparation Before START-UPInitial Inspection for QT Genset Startup START-UP Checklist ‹ Preparation for START-UP‹ START-UP Inspection Generator Control Operation Operating Unit with Manual Transfer Switch‹ Engine START-UP and Transfer ‹ Retransfer and ShutdownChecking Fluid Levels Cooling SystemMaintenance Owner Operator can Perform ‹ Changing the Engine AIR Cleaner Miscellaneous Maintenance‹ Cleaning the Generator ‹ Spark Plugs‹ Battery Repair Parts‹ Battery Maintenance ‹ Battery ReplacementKW 150 KW Standby GAS Engine Driven Generator Sets Service ScheduleMaintenance Level 11-3 11-4 Problem Cause Correction Troubleshooting GuideStandby Generator Sets Standby Generator Sets Page Assy Rotor 2390 80KB3 CPL Page Panel CB Conn BOX Page UL Circuit Breaker 225AF Page STAND, RH Control CPL C5 Page Washer Lock M10 Page MTG Base CP 5.4L 100KW DD Page Tray Battery Page Components Included in 0F1826E Page Pipe EXH Manifold 4.6L LH Page AIR Clnr BTM PLT W/CPLR 8.1L Page Tube Heater Water Page Starter 12 Volt Page Support NAT GAS Solenoid Page Support NAT GAS Solenoid Page Rear Wrap C5 Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Standby Generator Sets Warranty