Ariens 926042 quick start Step Three Install Chute Control Assembly

Page 5

Step Three: Install Chute Control

Assembly Cont.

3.Remove the rubber grommet from the control panel.

4.Make sure the chute control cable is routed between the lower handlebar and the bottom of the control panel, insert control assembly into slot in control panel from below and install assembly into nylon bushing in control panel.

5.Reinstall rubber grommet over control assembly knob and into control panel.

Image 5
Contents Quick Start Guide Step One Unfold Handlebar Step Two Install Discharge Chute Remove the gear cover from top of chute pedestal Step Three Install Chute Control AssemblyStep Three Install Chute Control Assembly Step Four Install Discharge Chute Rod Step Four Install Discharge Chute Rod Step Five Install Remote Deflector Control Cable Step Six Check Function of Dual Handle Interlock Step Seven Check Track Tension Step Eight Adjust Skid Shoes Step Nine Check Auger Gearcase Oil Step Ten Check Engine Crankcase Oil Step Eleven Fill Engine Fuel Tank Step Twelve Starting the Engine Starting Engine / Step a Throttle Starting Engine / Step B Fuel Valve Starting Engine / Step C Key Starting Engine / Step D Choke Starting Engine / Step E Prime Starting Engine / Step F Manual Start Starting Engine / Step F Electric Start Starting Engine / Step G Electric Start Starting Engine / Step H Warm up Step Thirteen Stopping the Engine Additional Resources