Ariens 926042 quick start Step Four Install Discharge Chute Rod

Page 7

Step Four:

Install Discharge Chute Rod Cont.

4.Hook the chute control cable onto the chute rod.

IMPORTANT: The chute control cable hook will prevent the cable from contacting the engine or muffler guard. Make sure the cable stays connected while unit is in operation.

5.Check to make sure the chute control cable ends are properly seated in control assembly and control arm.

6.Replace gear cover on top of chute pedestal.

7.Orient the chute and pedestal to its most vertical position and tighten pedestal hardware to 15-31 lbf-ft (20-42 N∙m).

8.Make sure the discharge chute rotates left and right when you push the discharge chute control lever left and right.

NOTE: If chute does not stay in position, adjust as directed in Discharge Chute Control in Owner Manual.

Image 7
Contents Quick Start Guide Step One Unfold Handlebar Step Two Install Discharge Chute Remove the gear cover from top of chute pedestal Step Three Install Chute Control AssemblyStep Three Install Chute Control Assembly Step Four Install Discharge Chute Rod Step Four Install Discharge Chute Rod Step Five Install Remote Deflector Control Cable Step Six Check Function of Dual Handle Interlock Step Seven Check Track Tension Step Eight Adjust Skid Shoes Step Nine Check Auger Gearcase Oil Step Ten Check Engine Crankcase Oil Step Eleven Fill Engine Fuel Tank Step Twelve Starting the Engine Starting Engine / Step a Throttle Starting Engine / Step B Fuel Valve Starting Engine / Step C Key Starting Engine / Step D Choke Starting Engine / Step E Prime Starting Engine / Step F Manual Start Starting Engine / Step F Electric Start Starting Engine / Step G Electric Start Starting Engine / Step H Warm up Step Thirteen Stopping the Engine Additional Resources