3M 2600 manual

Page 10

6.04Lock the spacer in place by tightening the locking screw using the supplied allen wrench.

6.05Place the ribbon holder into the cleaver. Push the ribbon holder against the cleaver spacer gauge .

6.06Align the end of the ribbon coating to be within the slot in the cleaver gauge. Adjust the ribbon position by pushing the ribbon holder firmly against the cleaver gauge and pulling back on the ribbon.

Note: Ensure that no fibers are crossed.

6.07 Close the cleaver clamping lid 1 .

6.08 Slide the scoring sled 2 across the bottom of the fibers.

10

Image 10
Contents Instructions Page Contents 265 673 Color Code GeneralPreparation Kit Product Number Fiber CountRibbon Preparation Cable PreparationConstruction Color Page Ribbon Holder Preparation Application ColorCleaver Operation Page Visual Inspection of the Cleave Fiber Insertion Applying the Pre-load Splice Actuation Not CenteredMulti-Fiber Stripper Cleaning and Maintenance Page Helpful Hints Splice Preparation Kits Splice Organizer Trays and AccessoriesOrdering Information System Components/Spare PartsPage 3M Telecom Systems Group Important Notice