Contents: |
| |
1.0 | General | 3 |
2.0 | Preparation Kit | 3 |
3.0 | Cable Preparation | 4 |
4.0 | Ribbon Preparation | 4 |
5.0 | Ribbon Holder Preparation | 6 |
6.0 | Cleaver Operation | 7 |
7.0 | Visual Inspection of the Cleave | 9 |
8.0 | Fiber Insertion | 10 |
9.0 | Applying the | 11 |
10.0 | Splice Actuation | 12 |
11.0 | 13 | |
12.0 | Helpful Hints | 15 |
13.0 | Ordering Information | 16 |
3