Intel SE7501CW2 manual Making Required Connections to the Server Board

Page 16

Intel Server Board SE7501CW2 Installation and Integration Guide

Making Required Connections to the Server Board

Make these connections regardless of the chassis used. Refer to your chassis documentation for additional connection requirements. For the Intel Server Chassis SC5200 Base or Redundant Power Version, connect the front system fans to the system fan 3 and 4 connectors on the server board.

Note:

If the fans are not configured properly, then they will run at a faster rate to compensate for what the system interprets as a missing fan.

AMain Power Connector

BAuxiliary Power Connector

C+12V CPU Power Connector

DCPU1 Fan (upper connector) and CPU2 Fan (lower connector)

ESystem Fan 1 (upper connector) and System Fan 2 (lower connector)

FFront Panel Connector

GSecondary IDE Connector (upper, white connector) and Primary IDE Connector (lower, black connector)

HSystem Fan 5

IFloppy Disk Drive Connector

JChassis Intrusion Header

KSystem Fan 3 (upper connector) and System Fan 4 (lower connector)

16

Image 16
Contents Server Installation and Integration Guide Revision History Table of Contents Administrator computers Client computers Target Audience Document OverviewThank you Troubleshooting Guide Minimum Hardware RequirementsPrepare for Assembly Hardware IntegrationSafety Instructions and Information Important Safety InformationElectrostatic Discharge ESD Chassis Preparation and Server Board Installation Installing the I/O ShieldAbout the I/O Shield Attaching the Gasket to the I/O ShieldInstalling the Rubber Bumper Installing Chassis StandoffsInstalling the Server Board Installing Memory Installing the Boxed Intel Xeon Processor Choosing the Processor SocketOpening the Socket Lever Attaching the ProcessorApplying Thermal Grease Installing the Retention MechanismAttaching the Heat Sink and Retention Clips Attaching the Fan/Intake Assembly Installing the Processor Wind TunnelAttaching the Heat Sink Fan Attaching the Wind Tunnel Making Required Connections to the Server Board Making Optional Connections to the Server Board Installing the Serial B Cable Installing the Access Cover Cable Routing Intel Server Chassis SC5200IDE or Scsi Cables Floppy and Front Panel CablesInstalling the Chassis Feet Pedestal Mode Installing into a Rack Rack ModeFinishing Up Updating the Bios Installing the Operating SystemLANDesk* Client Manager Installing LANDesk Client ManagerLANDesk System Requirements Installing the Intel SMaRT Tool Thank you for purchasing Intel products