Intel SE7501CW2 manual Hardware Integration, Prepare for Assembly

Page 7

Intel Server Board SE7501CW2 Installation and Integration Guide

Hardware Integration

The following installation procedures enable you to prepare a chassis for integration, add the needed components to your server board, and install the server board. The procedures are condensed from the more comprehensive and detailed Product Guides for the Intel Server Board SE7501CW2 and Intel Server Chassis SC5200. To access the most current and complete Product Guides and for more information, visit Intel Support at: http://support.intel.com/support/motherboards/server/SE7501C W2/index.htm

Prepare for Assembly

1.Gather tools needed:

Needle nose pliers

Flat blade screwdriver

Phillips head screwdriver

Antistatic wrist strap

2.Prepare a clean, static-controlled, level workstation.

3.Collect and organize all necessary hardware including the server board, memory, processor(s), and peripherals (hard drives, floppy disk drive, CD/DVD).

4.Verify that the components chosen for installation are listed as validated for use with the Intel Server Board SE7501CW2. This information is available from the Intel Support Web site: http://support.intel.com/support/motherboards/server/SE7501CW2/compat.htm.

7

Image 7
Contents Server Installation and Integration Guide Revision History Table of Contents Administrator computers Client computers Target Audience Document OverviewThank you Minimum Hardware Requirements Troubleshooting GuideHardware Integration Prepare for AssemblySafety Instructions and Information Important Safety InformationElectrostatic Discharge ESD Attaching the Gasket to the I/O Shield Chassis Preparation and Server Board InstallationInstalling the I/O Shield About the I/O ShieldInstalling the Rubber Bumper Installing Chassis StandoffsInstalling the Server Board Installing Memory Attaching the Processor Installing the Boxed Intel Xeon ProcessorChoosing the Processor Socket Opening the Socket LeverApplying Thermal Grease Installing the Retention MechanismAttaching the Heat Sink and Retention Clips Attaching the Fan/Intake Assembly Installing the Processor Wind TunnelAttaching the Heat Sink Fan Attaching the Wind Tunnel Making Required Connections to the Server Board Making Optional Connections to the Server Board Installing the Serial B Cable Floppy and Front Panel Cables Installing the Access CoverCable Routing Intel Server Chassis SC5200 IDE or Scsi CablesInstalling into a Rack Rack Mode Installing the Chassis Feet Pedestal ModeFinishing Up Installing the Operating System Updating the BiosLANDesk* Client Manager Installing LANDesk Client ManagerLANDesk System Requirements Installing the Intel SMaRT Tool Thank you for purchasing Intel products