Intel SE7501CW2 manual Document Overview, Target Audience, Thank you

Page 5

Intel Server Board SE7501CW2 Installation and Integration Guide

Introduction

Document Overview

This guide outlines the procedures for integrating an Intel® Server Platform using an Intel Server Board SE7501CW2 and Intel Xeonprocessors.

This guide consists of the most essential information first-time server builders need to successfully assemble an Intel server solution. Your particular operating system’s installation guide will cover the installation of the server’s operating system.

Target Audience

Intel channel program members who are expanding their expertise to include server platforms and current channel program members looking for a refresher on servers

System integrators deploying servers based on the boxed Intel Server Board SE7501CW2

Our intent is to better enable system integrators, particularly first-time server builders, to meet the competitive challenges they face in the server market and to keep program members up-to-date on emerging server technologies. By following the steps outlined in this document, you will be able to integrate an Intel Server Board SE7501CW2 with an Intel Server Chassis SC5200 in a timely and effective manner.

The Intel Server Chassis SC5200 is used as an example and is recommended for ease of integration and compatibility; other reference chassis may be different. Expanded installation instructions and complete product information are available in the Intel® Server Board SE7501CW2 Product Guide on the Resource CD. Unless otherwise noted, references to the Intel Server Chassis SC5200 include both the base version and the base redundant power version.

Thank you

Thank you for buying Intel Server Products.

5

Image 5
Contents Server Installation and Integration Guide Revision History Table of Contents Administrator computers Client computers Thank you Document OverviewTarget Audience Minimum Hardware Requirements Troubleshooting GuideHardware Integration Prepare for AssemblyElectrostatic Discharge ESD Important Safety InformationSafety Instructions and Information Installing the I/O Shield Chassis Preparation and Server Board InstallationAbout the I/O Shield Attaching the Gasket to the I/O ShieldInstalling the Server Board Installing Chassis StandoffsInstalling the Rubber Bumper Installing Memory Choosing the Processor Socket Installing the Boxed Intel Xeon ProcessorOpening the Socket Lever Attaching the ProcessorAttaching the Heat Sink and Retention Clips Installing the Retention MechanismApplying Thermal Grease Attaching the Heat Sink Fan Installing the Processor Wind TunnelAttaching the Fan/Intake Assembly Attaching the Wind Tunnel Making Required Connections to the Server Board Making Optional Connections to the Server Board Installing the Serial B Cable Cable Routing Intel Server Chassis SC5200 Installing the Access CoverIDE or Scsi Cables Floppy and Front Panel CablesInstalling into a Rack Rack Mode Installing the Chassis Feet Pedestal ModeFinishing Up Installing the Operating System Updating the BiosLANDesk System Requirements Installing LANDesk Client ManagerLANDesk* Client Manager Installing the Intel SMaRT Tool Thank you for purchasing Intel products