What’s Included

4.1What You Need

You will need the following tools for assembly of the parallel system connections.

3/8" slotted screwdriver

Phillip #1 screwdriver

Phillip #2 screwdriver

10mm hex driver

5mm hex driver

3/16" hex wrench

Star T10 screwdriver

10

Image 14
Contents Liebert GXT2-PP20KRT208 Page Table of Contents Specifications CommunicationImportant Safety Instructions Glossary of Symbols Introduction Redundancy Design Maintenance BypassCompatibility System DescriptionLiebert MultiLink Shutdown EthernetSystem Description Major Components Input and Output Slots for UPSMain Input / Output Terminal Blocks Optional Power Distribution Parallel Communication PortWHAT’S Included Items shipped with Liebert GXT2-PP20KRT208What You Need Installation Mount the Liebert GXT2-PP20KRT208 in a Rack or on a WallMount the Liebert GXT2-PP20KRT208 on a Wall Paralleling System Connections Installation Main Input and Output Terminal Block Connections Electrical requirementsAdd an Output Power Distribution Module-Optional Parallel POD Main Electrical Connection-Must Be Installed O/P O/P I/P O/PInitial Startup and Electrical Checks Paralleling for Capacity and Redundancy ConfigurationParalleling for Capacity Operating Modes OperationBypass Mode Parallel Communication Cable Disconnection Fault ConditionBattery Test Add a Single UPS to the Online Paralleling System Remove a Single UPS from the Paralleling SystemReplacing a Faulty Power Module or UPS Internal Battery Overload ConditionBattery Low Voltage-Battery Mode Communication Communication InterfaceUPS Status Information Calculating total load per UPS UPS Configuration Settings Specifications Parallel POD specificationsOptional output distribution specifications-PD-201 Page Net