System Description

2.4Liebert MultiLinkShutdown

The parallel POD supports the orderly shutdown of computer operating system through its compati- bility with Liebert MultiLink 1.5 software. When properly configured to operate with Liebert Mul- tiLink 1.5, the parallel POD will operate as a complete system; On Battery and Low Battery events will not be sent from the UPS when it is operating in redundant mode and the remaining UPS is able to support the total load.

For the paralleling system to work properly with Liebert MultiLink 1.5, each connected 10kVA UPS must have an SNMP card properly installed and configured in the Liebert IntelliSlot® bay. Liebert MultiLink 1.5 will not work properly with the parallel system through the serial port connection.

Figure 2 Liebert MultiLink connection diagram for parallel POD

Computer With

Liebert

MultiLink Agent

Ethernet

SNMP

SNMP

SNMP

UPS 1

UPS 2

UPS 3

Parallel

Parallel

Parallel

Port

Port

Port

Parallel

Port

Liebert

GXT2-PP20KRT208

Parallel POD

The SNMP card must be properly configured with an IP ADDRESS, NETMASK and GATEWAY. Refer to the SNMP card user manual for detailed instructions. The SNMP card must also be config- ured with a community string to be monitored by Liebert MultiLink. For details, refer to the Liebert MultiLink 1.5 user manual, SL-53620, available at the Liebert Web site, www.liebert.com

Liebert MultiLink 1.5 also must be properly configured for the software shutdown to work properly with the parallel system. Refer to the Liebert MultiLink 1.5 user manual for detailed configuration instructions. Two important settings required for Liebert MultiLink shutdown to work properly are:

The connection option “Liebert UPS (using SNMP port 162)” must be selected, either during installation or later (see Figure 3; refer to the MultiLink 1.5 user manual, SL-53620, for details).

The options “Enable shutdown after an on-battery event” and “Enable shutdown after a low-bat- tery event” must be selected for Liebert MultiLink to initiate shutdown when either of these events occur (see Figure 3; refer to the MultiLink 1.5 user manual, SL-53620, for details).

5

Image 9
Contents Liebert GXT2-PP20KRT208 Page Table of Contents Communication SpecificationsImportant Safety Instructions Glossary of Symbols Introduction Compatibility Maintenance BypassRedundancy Design System DescriptionEthernet Liebert MultiLink ShutdownSystem Description Input and Output Slots for UPS Main Input / Output Terminal BlocksMajor Components Parallel Communication Port Optional Power DistributionItems shipped with Liebert GXT2-PP20KRT208 WHAT’S IncludedWhat You Need Mount the Liebert GXT2-PP20KRT208 in a Rack or on a Wall InstallationMount the Liebert GXT2-PP20KRT208 on a Wall Paralleling System Connections Installation Electrical requirements Main Input and Output Terminal Block ConnectionsAdd an Output Power Distribution Module-Optional O/P O/P I/P O/P Parallel POD Main Electrical Connection-Must Be InstalledInitial Startup and Electrical Checks Configuration Paralleling for CapacityParalleling for Capacity and Redundancy Operation Operating ModesBypass Mode Fault Condition Battery TestParallel Communication Cable Disconnection Remove a Single UPS from the Paralleling System Add a Single UPS to the Online Paralleling SystemOverload Condition Replacing a Faulty Power Module or UPS Internal BatteryBattery Low Voltage-Battery Mode Communication Interface UPS Status InformationCommunication Calculating total load per UPS UPS Configuration Settings Parallel POD specifications SpecificationsOptional output distribution specifications-PD-201 Page Net