Emerson GXT 10KVA user manual Stationary Mounting

Page 15

Unloading

5.2Stationary Mounting

Additional stability can be added by bolting the mounting brackets (used in shipping) to the floor.

Mounting bracket on rear of unit

For greater stability, use a higher-grade bolt. Refer to the dimensions below when drilling holes for stationary mounting.

4-3/4" 4-3/4"

(120 mm) (120 mm)

28"

(711 mm)

Centerline of Unit

5/16" (8mm) diameter

6 places

Top View of Maintenance Bypass Cabinet

11

Image 15
Contents GXT 10KVA Page Table of Contents Specifications MaintenanceImportant Safety Instructions Glossary of Symbols General Description System DescriptionFront view Rear view without transformer Rear view with transformer UPS Mode Bypass ModeModes of Operation Bypass Switch User Selectable Output DistributionMajor Components Site Preparation Required Setup EquipmentInspection EnvironmentUnloading Unloading the Maintenance Bypass CabinetStationary Mounting Cable Installation Wiring PreparationPreparing Internal Wiring Dual Source ConfigurationMaintenance Bypass Cabinet with transformer Power Cable Installation Removing the Cover PlatesRepo Connection Conduit Input and Output WiringElectrical connections-transformer model MBC Electrical connections-non-transformer model MBC Connecting Nfinity to Maintenance Bypass with transformer Connecting Nfinity to Maintenance Bypass without transformer GXT10000T-208X GXT10000T-240X Start-Up and Initialization Shutting Down the UPSOperation Scheduled Maintenance MaintenanceProper Care General & Environmental Rating SpecificationsSpecifications Specifications Page Technical Support/Service Company Behind the ProductsLocations