Emerson GXT 10KVA user manual Proper Care, Scheduled Maintenance

Page 27

Maintenance

8.0MAINTENANCE

8.1Proper Care

Keeping your Liebert Nfinity Maintenance Bypass Cabinet operating properly is imperative to opti- mal performance and life of the unit. It is recommended that a certified technician perform preventive and corrective maintenance. Liebert Global Services (LGS) is dedicated to ensuring the highest level of performance and unmatched support for your Nfinity Maintenance Bypass Cabinet. Contact an LGS representative for services to guarantee maximum reliability and system availability.

8.2Scheduled Maintenance

Liebert recommends performing the following maintenance at least monthly:

Check, clean and replace filters.

Verify that airflow is not obstructed.

Liebert recommends performing the following maintenance annually:

Verify all power connections.

Verify that all output distribution modules are operating properly.

8.2.1Replacing Fan Filters—Transformer Models Only

The Maintenance Bypass Cabinet intake fans contain filters that will need to be replaced or cleaned periodically, depending on the surrounding environment. Check by noting the condition of the two fil- ters. If filters are dirty, replace or wash them. The filters may be taken out of the UPS for replace- ment or cleaning by removing the plastic cover over the filter frame. Use caution when replacing filters when fans are running.

Fan Filters

The fan filters are washable and may be reused. To wash these filters, place them under a running faucet (with the dirty side down) to remove dirt and dust. Blot dry with a towel and allow to air-dry before reusing it.

23

Image 27
Contents GXT 10KVA Page Table of Contents Specifications MaintenanceImportant Safety Instructions Glossary of Symbols General Description System DescriptionFront view Rear view without transformer Rear view with transformer UPS Mode Bypass ModeModes of Operation Bypass Switch User Selectable Output DistributionMajor Components Site Preparation Required Setup EquipmentInspection EnvironmentUnloading Unloading the Maintenance Bypass CabinetStationary Mounting Cable Installation Wiring PreparationPreparing Internal Wiring Dual Source ConfigurationMaintenance Bypass Cabinet with transformer Power Cable Installation Removing the Cover PlatesRepo Connection Conduit Input and Output WiringElectrical connections-transformer model MBC Electrical connections-non-transformer model MBC Connecting Nfinity to Maintenance Bypass with transformer Connecting Nfinity to Maintenance Bypass without transformer GXT10000T-208X GXT10000T-240X Start-Up and Initialization Shutting Down the UPSOperation Scheduled Maintenance MaintenanceProper Care General & Environmental Rating SpecificationsSpecifications Specifications Page Technical Support/Service Company Behind the ProductsLocations