Emerson GXT 10KVA user manual Electrical connections-transformer model MBC

Page 20

Cable Installation

Figure 9 Electrical connections—transformer model MBC

 

 

 

 

 

 

 

120V

 

 

 

 

 

 

 

 

 

 

 

 

 

120V

Common Ground

 

 

240V

 

 

 

 

 

 

 

 

 

 

 

 

 

208V

 

 

 

 

 

 

 

 

 

Wire Connection Torque

 

 

 

 

 

 

 

 

 

 

 

Value: 13 in-lbs

 

 

 

 

 

 

 

 

 

 

 

Common Ground

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Wire Connection Torque

 

 

 

 

 

 

 

 

 

 

 

Value: 120 in-lbs

 

 

 

 

 

 

 

 

 

 

 

TB4 Tap Selector

Terminal Block

Wire Connection

Torque Value: 28 in-lbs

TB1 & TB2 Maintenance

Bypass Terminal Blocks

Wire Connection Torque

Value: 50 in-lbs

GEC (Grounding Electrode Conductor)

Wire Connection Torque Value: 120 in-lbs

Common Ground

Wire Connection Torque

Value: 120 in-lbs

TB6 Hardwire Output

Terminal Block

Wire Connection Torque

Value: 35 in-lbs

Wire Connection Torque

Value: 120 in-lbs

TB5 UPS Output

Terminal Block

Wire Connection Torque

Value: 28 in-lbs

TB3 UPS Input

Terminal Block

Wire Connection Torque

Value: 50 in-lbs

Common Ground

Wire Connection

Torque Value: 120 in-lbs

16

Image 20
Contents GXT 10KVA Page Table of Contents Maintenance SpecificationsImportant Safety Instructions Glossary of Symbols System Description General DescriptionFront view Rear view without transformer Rear view with transformer Modes of Operation UPS ModeBypass Mode Major Components Bypass SwitchUser Selectable Output Distribution Required Setup Equipment InspectionEnvironment Site PreparationUnloading the Maintenance Bypass Cabinet UnloadingStationary Mounting Wiring Preparation Preparing Internal WiringDual Source Configuration Cable InstallationMaintenance Bypass Cabinet with transformer Repo Connection Power Cable InstallationRemoving the Cover Plates Input and Output Wiring ConduitElectrical connections-transformer model MBC Electrical connections-non-transformer model MBC Connecting Nfinity to Maintenance Bypass with transformer Connecting Nfinity to Maintenance Bypass without transformer GXT10000T-208X GXT10000T-240X Operation Start-Up and InitializationShutting Down the UPS Proper Care Scheduled MaintenanceMaintenance Specifications General & Environmental RatingSpecifications Specifications Page Locations Technical Support/ServiceCompany Behind the Products