Emerson GXT 10KVA user manual GXT10000T-240X

Page 25

Cable Installation

Figure 14 Connecting Maintenance Bypass to GXT10000T-240X

 

 

 

 

 

 

 

 

 

 

120V

120V

 

TB2

NFINITY MAINTENANCE BYPASS CABINET WITHOUT

TB5

240V

 

 

L1

 

 

TRANSFORMER

 

 

 

1

 

 

 

L2

 

 

 

 

 

 

 

2

 

 

Input 2

N

 

 

 

 

 

 

 

3

 

 

 

 

 

 

 

 

 

 

 

 

 

G

 

Remove these three wires

 

 

 

4

 

 

 

 

 

 

 

 

 

 

 

TB1

 

for dual source

 

 

 

G

 

 

 

 

 

(see NOTE below)

 

 

 

 

 

 

 

L1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

L2

 

 

 

 

 

 

 

G

 

 

 

 

 

 

 

 

 

 

 

 

 

Input 1

N

 

TB3

 

 

 

TB4

 

G

 

 

 

 

 

 

 

 

 

 

 

G

L1

L2

G

1

2

3

4

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Flexible

 

 

 

 

 

 

 

 

 

Flexible

conduit

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

conduit

 

 

 

 

 

 

 

 

 

 

 

 

GEC

 

 

L1

L2

N

L1

L2

Input

 

 

Output

External Battery

GXT10000T-240X

 

 

 

NOTE

 

 

 

 

1. SINGLE-SOURCEFEED—If feeding the Maintenance Bypass Cabinet from a single source, the input connection may be made to either TB1 or TB2.

2.DUAL-SOURCEFEED—If feeding the Maintenance Bypass Cabinet from a dual source, the UPS input supply connection must be made to TB1 and the bypass input supply connection must be made to TB2. The jumpers between TB1 and TB2 must be removed.

21

Image 25
Contents GXT 10KVA Page Table of Contents Specifications MaintenanceImportant Safety Instructions Glossary of Symbols General Description System DescriptionFront view Rear view without transformer Rear view with transformer Bypass Mode UPS ModeModes of Operation User Selectable Output Distribution Bypass SwitchMajor Components Inspection Required Setup EquipmentEnvironment Site PreparationUnloading Unloading the Maintenance Bypass CabinetStationary Mounting Preparing Internal Wiring Wiring PreparationDual Source Configuration Cable InstallationMaintenance Bypass Cabinet with transformer Removing the Cover Plates Power Cable InstallationRepo Connection Conduit Input and Output WiringElectrical connections-transformer model MBC Electrical connections-non-transformer model MBC Connecting Nfinity to Maintenance Bypass with transformer Connecting Nfinity to Maintenance Bypass without transformer GXT10000T-208X GXT10000T-240X Shutting Down the UPS Start-Up and InitializationOperation Maintenance Scheduled MaintenanceProper Care General & Environmental Rating SpecificationsSpecifications Specifications Page Company Behind the Products Technical Support/ServiceLocations