Chapter 2 Installation
Preparing for Installation
Installation Guidelines
When determining where to place the switch, observe these guidelines.
•Before installing the switch, first verify that the switch is operational by powering it on and running POST. Follow the procedures in the “Verifying Switch Operation” section on page
•For 10/100 ports and the 10/100/1000 port, the cable length from a switch to an attached device cannot exceed 328 feet (100 meters).
•For the
•Operating environment is within the ranges listed in Appendix A, “Technical Specifications.”
•Clearance to front and rear panels meet these conditions:
–
–Access to ports is sufficient for unrestricted cabling.
–
•Airflow around the switch and through the vents is unrestricted.
•Temperature around the unit does not exceed 113°F (45°C).
Note If the switch is installed in a closed area, such as a wiring closet, the temperature around it might be greater than normal room temperature.
•Cabling is away from sources of electrical noise, such as radios, power lines, and fluorescent lighting fixtures.
Verifying Package Contents
Note Carefully remove the contents from the shipping container, and check each item for damage. If any item is missing or damaged, contact your Cisco representative or reseller for support. Return all packing materials to the shipping container and save them.
The switch is shipped with these items:
•AC power cord
•Mounting kit containing these items:
–Four rubber feet for installing the switch on a desktop
–Three
–Screw template for aligning screws
–Magnet for mounting the switch on a metal surface
•One
•Catalyst 2940 Switch Getting Started Guide (order number
Catalyst 2940 Switch Hardware Installation Guide
|
| ||
|
|