
| Chapter 2 | Installation | 
Installing the Switch
Figure 2-5  Installing the Mounting Screws on a Wall
1
2
| THIS | 
 | 
 | 
 | 
 | 
 | |
| 
 | SIDE | 
 | 
 | 
 | 
 | |
| 
 | 
 | AWAY | FROM | |||
| MOUNTING | 
 | 
 | 
 | |||
| 
 | 
 | 
 | SURFACE | |||
| 
 | SCREW | 
 | 
 | 
 | 
 | |
| P/N | 
 | TEM | PLATE | |||
| 700- | 
 | |||||
| 
 | 
 | REV. | ||||
| 
 | 
 | 
 | 
 | 
 | 
 | A0 | 
| CABLE | 
 | 
 | 
 | 
 | ||
| 
 | 
 | SIDE | 
 | 
 | 
 | |
| 
 | 
 | 
 | ENTRY | |||
2
3
2
89854
1
2
3
Wall
Screws
Screw template
Step 3 Peel the adhesive strip off the bottom of the screw template.
Step 4 Attach the screw template to the wall.
Step 5 Use a 
Step 6 Insert three screws in the slots on the screw template, and tighten until they touch the top of the screw template.
Step 7 Remove the screw template from the wall.
Catalyst 2940 Switch Hardware Installation Guide
| 
 | 
 | |
| 
 |