Cisco Systems 3030 manual Waiting for Post to Complete, Completing the Initial Configuration

Page 13

Cisco Catalyst Blade Switch 3030 Getting Started Guide

Installing the Switch Module in the Server Chassis

Waiting for POST to Complete

Follow these steps:

Step 1 Wait for the switch to complete the power-on self test (POST). It might take several minutes for the switch to complete POST.

Step 2 Verify that POST has completed by confirming that the System Status/ID LED is off, and the Console LED is solid green or amber. If the switch fails POST because of a misconfiguration or error, the System Status/ID LED blinks green, and the Console LED is off.

Log into the DRAC/MC console to get more details about the failure mode.

POST errors are usually fatal. Call Cisco Customer Support immediately if your switch fails POST.

See item 4 in Figure 1 on page 4 for the location of the System Status/ID LED and the Console LED.

Step 3 Wait for the switch to complete flash initialization. When you see the prompt Press Return to Get Started!, press Return or Enter.

Step 4 Make sure that the System Status/ID LED on the switch module is off and the Console LED is green or amber. This means that the switch module is operating properly.

Step 5 See the “Completing the Initial Configuration” section on page 1-13for instructions on setting up and initially configuring the switch module.

Completing the Initial Configuration

Follow these steps to complete the setup program and to create an initial configuration for the switch.

Note For information about automatically configuring the switch, see the “Assigning the Switch IP Address and Default Gateway” chapter in the switch configuration guide.

 

 

Cisco Catalyst Blade Switch 3030 Getting Started Guide

 

 

 

 

 

 

78-17052-01

 

 

1-13

 

 

 

Image 13
Contents Cisco Catalyst Blade Switch Getting Started Guide Taking Out What You Need ContentsCisco Gigabit Ethernet Switch Module Description Cisco Gigabit Ethernet Switch Module Dell Modular Server Chassis Architecture Installing the Switch Module in the Server Chassis 143473 Switch module 3 Release latch Server chassis Connecting through the Switch Module Console Port Configuring the Switch ModuleConnecting through the Switch Module Console Port Connecting through the DRAC/MC Enter ~ Waiting for Post to Complete Completing the Initial ConfigurationTo configure Snmp now, enter yes Line vty 0 Using the CLI Managing the SwitchUsing the Device Manager Other Management Options Installation Warning StatementsConnect to the 10/100/1000 Ports Connect to the Switch PortsConnecting to 10/100/1000 Ports Verify Port Connectivity Resetting the Switch Configuration Troubleshooting Initial Configuration SetupCase of Difficulty Accessing Help Online For More Information Obtaining DocumentationProduct Documentation DVD Cisco.comOrdering Documentation Cisco Product Security Overview Documentation FeedbackEmergencies security-alert@cisco.com Reporting Security Problems in Cisco ProductsCisco Technical Support & Documentation Website Obtaining Technical AssistanceDefinitions of Service Request Severity Submitting a Service RequestObtaining Additional Publications and Information 78-17052-01 Hardware Warranty Terms Duration of Hardware Warranty 78-17052-01