Site Preparation and Safety Information
Table 5 | Cisco 7301 JATE Approvals for Port Adapters (continued) | ||
|
|
| |
Applicant Name | Model Number | Approval Number | |
|
|
| |
Nihon Cisco Systems | |||
|
|
| |
Nihon Cisco Systems | |||
|
|
| |
Nihon Cisco Systems | |||
|
|
| |
Nihon Cisco Systems | |||
|
|
| |
Nihon Cisco Systems | |||
|
|
| |
Nihon Cisco Systems | |||
|
|
| |
Nihon Cisco Systems | |||
|
|
| |
Nihon Cisco Systems | |||
|
|
| |
Nihon Cisco Systems | |||
|
|
| |
Nihon Cisco Systems | |||
|
|
| |
Nihon Cisco Systems | |||
|
|
| |
Nihon Cisco Systems | |||
|
|
| |
Nihon Cisco Systems | |||
|
|
| |
Nihon Cisco Systems | |||
|
|
| |
Nihon Cisco Systems | |||
|
|
|
|
Site Preparation and Safety Information
Preparing Your Site for Installation
To ensure normal system operation, plan your site configuration and prepare your site before installation.
Choosing a Site for Installation
•Install the system in a restricted access area, where access can be gained only by service personnel through the use of a special tool, lock and key, or other means of security.
•Choose a site with a dry, clean,
•Choose a site that maintains an ambient temperature of 32 to 104oF (0 to 40oC).
Ensuring Overcurrent Protection
The system relies on the protective devices in the building installation for protection against
Grounding the System
•Do not defeat the ground conductor on an AC plug.
Regulatory Compliance and Safety Information for the Cisco 7301 Internet Router
| 61 |
| |
|
|