Cisco Systems A03D600GA2 manual Configuring the Server

Page 11

CONFIGURING the SERVER

CONFIGURING the SERVER

Follow these steps to configure the Cisco UCS C220 M3 High-Density SFF Rack Server:

STEP 1 VERIFY SERVER SKU, page 12

STEP 2 SELECT CPU(s), page 13

STEP 3 SELECT MEMORY, page 16

STEP 4 SELECT RAID CONFIGURATION, page 22

STEP 5 SELECT HARD DISK DRIVES (HDDs) or SOLID STATE DRIVES (SSDs), page 29

STEP 6 SELECT PCIe OPTION CARD(s), page 31

STEP 7 ORDER OPTIONAL NETWORK CARD ACCESSORIES, page 34

STEP 8 ORDER POWER SUPPLY, page 38

STEP 9 SELECT AC POWER CORD(s), page 39

STEP 10 ORDER OPTIONAL REVERSIBLE CABLE MANAGEMENT ARM, page 42

STEP 11 ORDER A TRUSTED PLATFORM MODULE (OPTIONAL), page 43

STEP 12 ORDER CISCO FLEXIBLE FLASH SD CARD MODULE (OPTIONAL), page 44

STEP 13 ORDER OPTIONAL USB 2.0 DRIVE, page 45

STEP 14 SELECT OPERATING SYSTEM AND VALUE-ADDED SOFTWARE, page 46

STEP 15 SELECT OPERATING SYSTEM MEDIA KIT, page 49

STEP 16 SELECT SERVICE and SUPPORT LEVEL, page 50

OPTIONAL STEP - ORDER RACK(s), page 55

OPTIONAL STEP - ORDER PDU, page 56

Cisco UCS Cisco UCS C220 M3 High-Density Rack Server (Small Form Factor Disk Drive Model)

11

Image 11
Contents SAN JOSE, CA REV C.18 December 17 Spec SheetStep Step Verify Server SKUContents Page Overview Shows the Cisco UCS C220 M3 High-Density SFF Rack Server Chassis Front ViewChassis Rear View Shows the external features of the rear panelNIC Capabilities and Features Capability/Feature DescriptionChassis One rack unit 1RU chassis CPUCapability/Feature Description Acpi Configuring the Server Cards, with 1 rail kit Verify Server SKUVerify the product ID PID of the server as shown in Table QPI Select CPUsDDR3 Dimm Product ID PID Freq Size CoresNumber GHz Support MHz1 Intel Xeon E5-26002 Caveats Approved Configurations CPU configurationsSelect any one CPU listed in Table Select two identical CPUs from any one of the rows of onC220 M3 SFF Memory Organization Select MemoryMemory Mirroring Option Select DIMMs and Memory MirroringDimm Dimm OptionsA1, B1 A1,B1 C1,D1 A1,B1, C1 A2, B2, C2 A2,B2 C2,D2 CPU configuration with memory mirroringA1, B1 E1, F1 A1,B1 C1,D1 DPC Dimm Memory SpeedsConfiguring the Server Select RAID Configuration UCSC-RAID-ROM5 Select RAID OptionsAvailable Embedded RAID Options Product ID PID PID Description RAID ControllersUCSC-RAID-MZ-220 UCSC-RAID-11-C220Super Capacitor Option RAID Configuration Options not available for embedded RAIDAvailable PCIe RAID Controller Options Approved Configurations RAID4 RAID RAID1Caveats SSDs Select DrivesHDDs You can mix Sata and SAS drives Host Bus Adapters HBAs Select PCIe Option CardsNetwork Interface Cards NICs One PCIe RAID controller Approved Configurations No PCIe RAID controllerUCS Storage Accelerators Configuring the Server Choose Optional SFP Modules Order Optional Network Card AccessoriesChoose Optional Twinax Cables Available Twinax Cables Product ID PID PID DescriptionCaveats Cisco VIC 1225T Dual Port 10GBaseT CNA Preinstalled do not change SFPBroadcom 57712 Dual Port 10Gb SFP+ w/TOE iSCSI Cisco VIC 1225 Dual Port 10Gb SFP+ CNANetwork Card Connections UCSC-PSU-650W Order Power SupplyPower Supply PIDs UCSC-PSU-450WCAB-C13-CBN Available Power Cords Product ID PID PID Description ImagesR2XX-DMYMPWRCORD CAB-N5K6A-NACAB-9K10A-EU CAB-9K10A-AUAvailable Power Cords Product ID PID PID Description Cable Management Arm for C220 rack servers Order Optional Reversible Cable Management ARMCable Management Arm UCSC-CMA1UCSX-TPM1-001 Trusted Platform Module Order a Trusted Platform Module OptionalTrusted Platform Module Product ID PID PID Description UCS-SD-16G Order Cisco Flexible Flash SD Card Module OptionalSecure Digital SD Card preloaded with software Second Secure Digital SD Card blankUCS-USBFLSH-S-4GB See on page 57 for the location of the USB connectorOrder Optional USB 2.0 Drive USB 2.0 DriveSuse Select Operating System and VALUE-ADDED SoftwareUCS Director BMCNexus 1000V for Hyper-V and vSphere Configuring the Server OS Media Product ID PID PID Description Select Operating System Media KITProduct ID PID On Site? Description Unified Computing Warranty, No ContractCisco SMARTnet for UCS Service SMARTnet for UCSUC Plus 8X5XNBDOS UCS C220 M3 SFF CON-UCW7-C220M3SFUCS HW 24X7X4OS UCS C220 M3 SFF CON-UCW5-C220M3SFGSP Partner Support Service for UCSService Product ID PID Level Description Site? Unified Computing Combined Support ServiceUCS DR UCSD7 UCSD7CON-UCWD5-C220M3SF UCWD7CON-UCWD7-C220M3SF UCWD5Racks and Rack Options For more information about the PDU, see PDUs, PDU OptionsProduct ID PID PID Description RP208-30-2P-U-2 Zero RU PDU Supplemental Material Physical Layout CPUs and DIMMsCPU1 DIMMs per Channel DPC Memory Population RulesDPC or 2 DPC DPCPopulate the DIMMs for a CPU according to Table Dimm Population OrderRecommended Memory Configuration Total Supported Dimm Configurations Total DIMMsSupported Dimm Populations CPULow-Voltage Dimm Considerations RAID Details Available RAID configurations are shown in this sectionCPU Configurations Select one of the following Example Bios Screen for Oprom RAID Option ROM Oprom SettingsSerial Port Details Serial Port Female RJ-45 Connector PinoutUpgrade and Servicing-Related Parts Adding an Additional CPU with CPU heat sink Motherboard Lithium BatteryCPU Removal and Installation pick n place Tool Set Drive Blanking PanelsCPU Heat Sink Cleaning Kit Air Baffle Replacement KitRacks Cisco R42610 Rack Zero Rack Unit PDU PID = RP208-30-2P-U-2 PDUsKVM Cable KVM Cable Product ID PID PID DescriptionN20-BKVM KVM cable for B-Series Blade Server console portMotherboard USB and SD Ports, and RAID Card Backup Location UCS C220 M3 Dimensions and Weight Parameter Value Dimensions and WeightPower Specifications Technical Specifications Output Class RSP1Input UCS C220 M3 Environmental Specifications Parameter Minimum Environmental SpecificationsKN24 Compliance RequirementsCISPR24 EN300386
Related manuals
Manual 146 pages 4.56 Kb